Boilers


Post Date: Oct 12, 2007
Expiry date: Oct 11, 2008

Click to send a quotation

Detailed Buying Lead Description
 

Requirements to Suppler.

�      Turn key project implementation

�      Experience in turn-key boiler equipment installation (please send us reference list and timing for realization of similar equipment);

�      Have all necessary licenses and permissions for performing such activities in EU or CIS (incl. Russia).

 Requirements to boiler equipment.

�         Boiler should be fueled by degasification methane with concentration 30-96%. Calculation should be performed for 150-250 cub. m./h of pure methane (500-900 cub m./h of gas mixture).

�         Temperature graphic of hot water 70-95  

�         Noxious agent concentration of the exhaust gas from boiler chimney to atmosphere should meet the sanitary code demands.

�         Running regime automatic boiler-plant (without operating personal) with possibility to transfer data to PC.

�         Boiler plant should be fulfilled in modular implementation and should comprise:

- Gas treatment equipment;

- Burner equipment with automatic methane feeding regulation;

- Pumping equipment and pipeworks;

- Electric power supply equipment and panels;

- instrumentation and automated control systems;

- thermal insulation inside the container.

Delivery DDU (Kemerovo, Russia) Incoterms 2000.

Installation works include: assembling of modular boiler plant, installation of instrumentation and automated control systems and its check-out works, commissioning work.

Sign in to view this buyer's contact information.
Not an Alibaba member yet?

This member's information has NOT been authenticated or verified by Alibaba or any third party. Only Alibaba Gold Suppliers and TrustPass members have completed an Authentication and Verification procedure conducted by third-party credit-reporting agencies.
For more information on Alibaba Gold Supplier and TrustPass membership, Click here



Email this page Bookmark this page Print this Page