View this buyer's contact information please Sign in now!
Not a member yet? It takes less than a minute to Join FREE now!
As a recently established company, we will invest in a power plant for 1.5 MW that will use biomass (olive flakes / wood scraps).
We are looking for turnkey projects with all equipment and installations (except the building). The station will use artesian water available at site.
The fuel will be olive flakes or woodchips with 10-20 mm pieces.
The location of the site is Torbali - Izmir Turkey, which is 25 km from Izmir port.
The grid is 34.5 kva, and the frequency is 50 hertz.
The turbine should be a condensing turbine.
Boiler should be moving grate, and should confirm to environmental emission levels applicable in the EU.