16 inch table solar fan china manufacturer solar outdoor fan

FOB Reference Price:Get Latest Price
US $10-13.5 / Piece | 500 Piece/Pieces (Min. Order)
Supply Ability:
1000 Piece/Pieces per Day
Port:
guangzhou,shenzhen
Overview
Quick Details
Power Source:
Battery or Solar
Type:
Air Cooling Fan
Installation:
Pedestal
Material:
Plastic
Certification:
CE, RoHS
Power (W):
22
Voltage (V):
12
Brand Name:
OEM;OX; FOREVER; MAVISA; MASHA
Model Number:
FT-DC16Ha1
Place of Origin:
Guangdong, China (Mainland)
Product::
solar outdoor fan
Base::
Round
RPM::
1350
Overall height::
1.3M
Quantity of battery:
2 units
Plugs::
VDE, UL, BS, SAA, Italy
Remote control;:
Without
Color::
red blue
Voltage::
220V OR 15V
Power(W)::
22
Packaging & Delivery
Packaging Details:
Packing: 1pc/gift box, 570*140*440mm. 20GP"970pcs 40HQ:1970pcs
Delivery Detail:
15~20 days

Specifications

solar outdoor fan:
*Safe and energy-saving,
*Stable quality; Long-life operation,
*Prompt delivery,
*New excellent design,

solar outdoor fan:
*Safe and energy-saving; Stable quality;

* Long-life operation; Prompt delivery;

*Well selling in Pakistan.

*New excellent design

solar outdoor fan

1.  Voltage:100V-240V.    
2.  Frequency:50Hz/60 Hz.   
3.  Battery6V/4Ah×2.
4.  Charger:15V/2A  30W.
5.  Fan Power: 12W.
6.  Speed Settings:3.  
7.  Timer: With 60-minute.    
8. Switch:4-key button.   
9. Safety Protection:the fan will stop automatically when something block the blade.
10. Operation Time when Bettery is Full:High:3.5h;Middle:6h;Low:9h.
11. Charge Time:DC/Solar(Plenty of Sunshine)8 hours later the light turns from red to green.
12. Notice:In winter, charge the battery fully,then pull out the battery outlet in the base.It will make the battery have a long operation life.
13. Grills: 430mm×1.3mm2.    
14. N.W.:  4.2kgs.  
15. G.W.:  5.2kgs.                

16,Packing: 1pc/gift box, 570×140×440mm.

 

Henry Ma is here to serve you:

Skype:henryma521

Mobile phone: 0086-13076887375

QQ:413280838

WeChat (weixin): henryblessing

Payment term:                                                                             

* For sample:full T/T, 2 day will be delivery after the payment

* For mass product: T/T, 30% deposit, 70% before the container loaded

* Manufacture time: 15~20 days after received the deposit.