• Sourcing Solutions
  • Services & Membership
  • Help & Community
Add to My Favorites Added to My Favorites

Asphalt pavement sealant

FOB Reference Price:Get Latest Price
US $1,000 - 2,100 / Ton | 10 Ton/Tons (Min. Order)
Supply Ability:
100 Ton/Tons per Month
Port:
FOB QingDao
Seller Support:
Payment protection
On-time shipment
Product quality protection
Payment:
More

Quick Details

Place of Origin:
Henan, China (Mainland)
Classification:
Hot Melt Adhesives
Main Raw Material:
Asphalt
Usage:
Construction
Brand Name:
Tongda
Model Number:
Ningway
Color:
Black
Main Composition:
Asphalt
Using Method:
Hot Melt
Softening Point:
95℃
Flow Level:
1.7mm
Best Heating:
160~170℃
Asphalt Compatibility:
Compatible
Package:
Translucent Plastic Film and carton outside

Packaging & Delivery

Packaging Details: Plastic bag inside and Carton Outside
Delivery Detail: 7 working days after receive your payment

Specifications

1.excellent adhesion.
2.flexibility under low temperature.
3.stability under high temperature.

We all know that water is the most destructive element to our pavements. If it rained and snowed

everywhere but on our roads and bridges, 90 percent of highway and street work would be

eliminated. Since that is not likely to happen any time soon, we need to prevent water intrusion

into our pavements. Filling or sealing pavement cracks to prevent water from entering the base

and subbase will extend the pavement life by three to five years.

Our “Ning-way” brand road crack sealant is a kind of hot applied road sealing material. It is made

Of matrix asphalt, high polymer, stabilizer and other additive. It is used for sealing the cracks and

Pit slots of the asphalt concrete pavement.

How to applied our hot applied road crack sealant?

 1. Close the traffic:
Set construction signs according to technical specifications in accordance with
road maintenance.

 

 

2. Clean the crack: Clean the cracks by cutter and blower.

 

3.Heat the road crack sealant by crack filling machine:
Put the crack sealant into heat container and heat it to 120~150°C. . Keep mixing
and stirring while heating, and keep the temperature below 170°C.

 

4.Fill the cracks and seal the pothole.

 

5.Open the traffic: The crack sealant can be solidified in 1 hour, you can open
the traffic in 1 to 2hour after the construction.

Transaction History of the Supplier

Below is the information about the supplier's transactions conducted via Alibaba.com. If you require further details regarding the transaction data, please contact the supplier directly.

Transaction Overview

Transactions

Transaction Details

This supplier has completedtransactions with buyers from .

Shipping Destination
Transaction Value
Transaction Date

Send your message to this supplier

Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
China (Mainland) | Manufacturer, Trading Company
Supplier Assessments:
You May Like:
aisn-detail010185235026