• Sourcing Solutions
  • Services & Membership
  • Help & Community
Add to My Favorites Added to My Favorites

Auto filter AB Glue

FOB Reference Price:Get Latest Price
US $3.5 - 5.5 / Kilogram | 1000 Kilogram/Kilograms (Min. Order)
Supply Ability:
10000 Kilogram/Kilograms per Day
Port:
XINGANG PORT
Seller Support:
Payment protection
On-time shipment
Product quality protection
Payment:
More

Quick Details

CAS No.:
3506911000
Other Names:
polyurethane adhesive
EINECS No.:
210-898-8
Place of Origin:
Hebei, China (Mainland)
Classification:
Double Components Adhesives
Main Raw Material:
Polyurethane
Usage:
Plastc,Metal,Paper Class
Brand Name:
JASL
Model Number:
SLAP140
material-A is red:
material-B is dark black

Packaging & Delivery

Packaging Details: 200kg/iron drum
50kg/plastic barrel&20kg/plastic bucket
Delivery Detail: 10-15 days after your deposit

Specifications

Flexibility, strong tension
Easy operation
Injection to make end cover
Delivery time: 10 -15days after your deposit

 

Two-component polyurethane adhesive for handwork

component proportion ratio is 100:40

 

Material-A

Material-B

Weight

Small barrel :25KG

10KG

Big barrel :50KG

20KG

Physical nature

orange-red viscous liquid color based on your request to configure

brown-yellow liquid

viscosity

800-1000MPa.S(25°C)

25-50MPa.S(25°C)

density

1.02g/ml

1.02g/ml

package

Plastic bucket or Tin bucket

Plastic bucket ,Tin bucket, Plastic pots

storage

1. Material-A and material-B can store up 3-6 months.

2. To appropriate indoor storage above 15°C

 Usage:

1.Material-A should stirred evenly with plastic hand electric drill, material-B can shake, before used.

2. Open the electrocaloric plate temperature to 40-50 degrees,in winter material-A and material-B with a small container to preheat.

3. Wipe the mould with release agent

4. material-A and material-B are mixed at the mixture ratio of 100:40 ratio, then add 40% talcum powder, with 2800 rev / min motor to mix, mixing time determined by the amount of adhesive, per 100g of adhesive is approximately 7-10 seconds .

5.pour the Mixed liquid into mould,then put the paper element and give a little pressure on it.

6.10 minutes later you can bring the mould down.

attentions:

1.the products are generally stored in a dry room, and pay attention to water, moisture and sun. Must cover the plug and cover, to avoid absorbing rubber moisture in the air, affect the results.

2.material-A or material-B could be used in the normal temperature of (25°C), it will have an bad effect on the usage if the temperature was too high or too low. must be lower down or rise the temperature by manpower

3. Brushing the Mold release agent before pouring the glue into the model, keeping dry then pouring. 

  

 

 

Transaction History of the Supplier

Below is the information about the supplier's transactions conducted via Alibaba.com. If you require further details regarding the transaction data, please contact the supplier directly.

Transaction Overview

Transactions

Transaction Details

This supplier has completedtransactions with buyers from .

Shipping Destination
Transaction Value
Transaction Date

Send your message to this supplier

You May Like:
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
China (Mainland) | Manufacturer, Trading Company
Transaction Level:
Supplier Assessments:
2 Transactions 10,000+
The supplier’s transactions conduted via Alibaba.com in the past 6 months.
You May Like:
aisn-detail010185203195