Beer factory using stainless steel or copper 1000L brewery equipment
- Shipping:
- Support Sea freight
- Product Type:
-
Beer
- Type:
-
Ale
- Variety:
-
Beer
- Color:
-
Light
- Processing Type:
-
DRAFT BEER
- Packaging:
-
Other
- Shelf Life:
-
5
- Weight (kg):
-
500
- Place of Origin:
-
Shandong, China
- Brand Name:
-
Zhuoda
- Model Number:
-
ZD-1000L
- Material:
-
SUS304 & Red Copper
- Insulation material:
-
rockwool
- Thickness:
-
3.0
- Racker:
-
top
- Cooling jacket:
-
dimple plate
- Layer:
-
Doule Insulation Jacket
- Automatic Grade:
-
a
- port:
-
according
- Service:
-
free
- Packaging Type:
-
according
- Supply Ability:
- 150 Set/Sets per Year
- Packaging Details
- Films outer of the tanks, top and bottom fixed with containers. In 40 or 20 container.
- Port
- Qing dao
- Lead Time :
- 30 days
Online Customization
Beer factory using stainless steel or copper 1000L brewery equipment
- 1. Introduction of our company
Jinan Zhuoda Beer Brewery Equipment Company which in the field of making beer brewery equipment nearly 8 years. With so many years experience in this field, our products had been to lots of foreign countries such as US, Korea, India, Singapore, Russia and so on. Our workers have more than 5 years experience in the welding field. I believe with so many experience and good after-sale service, our products must can meet your requirement.
- 2.Equipments Components
Beer factory using stainless steel or copper 1000L brewery equipment is good for bar, pub or beer factory using. In one complete system, there are water treatment machine, grain miller, brewhouse such as mash tank, lauter tank, whirlpool tank, boiling tank, hot water tank, fermenter tank, bright beer tank, filter and so on. Tell us your need, we can do the specail design for you !!
Equipments Request | Components |
1. Milling System | Malt Miller |
2. Mashing System | Mash/Lauter Tun |
Boiler Tank | |
Boiler | |
Heat Exchanger | |
Wort Pump | |
Stir Device (Optional) | |
Other accessories are available: 1. Ornamental Pipe;2.Mashing Pipeline; 3. Yeast Feeder; 4. Venturi Tube; 5. Butterfly Valve DN40; 6. Butterfly Valve DN32; 7. Soft Pipe; 8. Dregs Rake; 9. Sugar Measuring Cylinder; 10. Saccharimeter; | |
3. Fermenting System | Fermentation Tank |
Other accessories are available: 1. L-Pipe; 2. Butterfly Valve; 3. Pressure Gage; 4. Solenoid Valve; 5. Vacuum Valve; 6. Cooling Pipe; 7. Thermal Insulation Pipe; | |
4. Cooling System | Ice Water Tank |
Refrigeration Machine | |
Centrifugal Pump | |
Evaporator | |
Ice Water Pump | |
Relative Pipes and Valves | |
5. CIP System | Washing Tank |
Sterilization Tank | |
Pump and Valve | |
6. Filter System | Kieselguhr Filter |
Membrane Filter | |
Filtered Beer Tanks | |
7. Packing System | Fresh Keg Packing Machine |
Pop Can Packing Machine | |
Glass Bottle Packing Machine | |
8. Controlling System | Mashing Control Panel |
Fermenting Control Panel | |
Refrigerating Control Panel |
- 3. Parameter of Various Models
Model Items | ZD-50L | ZD-1HL | ZD-2HL | ZD-3HL | ZD-5HL | ZD-6HL | ZD-10HL |
Capacity | 50L/Day | 100L/Day | 200L/Day | 300L/Day | 500L/Day | 600L/Day | 1000L/Day |
Area Request | 2m² | 15m² | 20m² | 40m² | 50m² | 60m² | 100m² |
Power peak loading | 2Kw | 12Kw | 15Kw | 22Kw | 35Kw | 45Kw | 70Kw |
Steam Request | ______ | _______ | _____ | _____ | 0.1Ton/Hr | 0.12Ton/Hr | 0.15Ton/Hr |
Water Consumption | 0.1m³/Day | 0.5m³/Day | 0.8m³/Day | 1m³/Day | 1.5m³/Day | 2m³/Day | 3m³/Day |
- 4. Beer Brewing Process
If don't know how to make beer, doesn't matter, we will arrange free trainning for you and also can provide special beer recipe for you !
- 5. Raw material
- 6. Production Showcase
- 7. working and polishing
- 8. customer visiting
- 9. product delivery
- 10. picture of our company
- 11. Guarantee and after-sale service
1) the equipment is guaranteed for 5 years warranty for main tank and we supply maintenance all life for free
2) professional technology support team could guide your equipment's installation, brewing and also would like to go to your country for training.
3) free installation will extend to 35 days
4) usually, our accessory and spare parts are supplied to the clients with only one set. In order to thank for your trust and our long term cooperation, we would like to give our accessory and spare aprts of two sets such as butterfly, tri-clamps, ball valve and so on.
- 12. CE certification
If have free time, welcome to visit our company and enjoy the beer made by ourself, wait for your coming !!!
You May Like
You May Like
≤15h
Response Time
The average amount of time supplier took to respond to every buyer’s first message over the past 30 days.
|
|
4,000+ for 2 Transactions
The supplier’s transactions conducted via Alibaba.com in the past 6 months.
|
|
On-time delivery rate |