Concrete Monopole 30m, 40m, 50m

FOB Reference Price:Get Latest Price
US $30,000-50,000 / Unit | 2 Unit/Units Depending on distance (Min. Order)
Supply Ability:
1 Unit/Units per Day
Port:
CIF Port Klang, Malaysia
Overview
Quick Details
Place of Origin:
India
Brand Name:
HBL
Model Number:
Concrete Spun Monopole
30 m:
USD 30,000 CIF Port Klang, Malaysia
40 m:
USD 40,000 CIF Port Klang, Malaysia
50 m:
USD 50,000 CIF Port Klang, Malaysia
Packaging & Delivery
Delivery Time
12-18 Weeks Upon First Payment

Specifications

Kogen Sdn Bhd is the sole distributor of HBL concrete spun monopole and batteries for Malaysia and Indonesia.

01. Background

Kogen Sdn Bhd is seeking an interest for an opportunity to develop a potentially 30m, 40m and 50m Spun Concrete Monopole of Telecommunication Tower in Malaysia. The spun monopole comprises a new environmental- friendly technology consists of concrete replacing originally steel monopole tower  in which able to improves durability with equal signal transmitting power. The product manufactured by HBL and is internationally certified through SERC and JNTU. Kogen is keen to invite potential investors to participate in the project development.

2. The Product

2.1          Spun Concrete Monopole Tower.

 

Table 1.0 40m tower specification

Specification

Unit

 

Length

m

30,40,50

Bottom diameter

m

1.2

Top diameter

m

0.4

Maximum wind speed withstand

kmph

170

Weight

tonnes

34

No. of GSM

 

Up to 12

No. of Microwave antennae

 

Up to 16 in different orientation

 

2.2          Concrete Tower vs Steel Tower

Specification

Concrete Tower

Steel Tower

Ground Space Required

3 Sq Meters

14 Sq Meters

Foundation

Single Foundation

Multiple Foundation

Manufacturing Time

2 Days

14 Days

Foundation Time

7 Days

14 Days

Erection Time

2 Days

10-15 Days

Bolts/ Joints

3 Joints

More than 1000 Joints

Long Term Expenses

No maintenance

Requires regular maintenance

Multiple Load Points

Always possible through the length of tower

No changes are possible

Variation of cost on change in loading/ foundation etc.

Nominal

Huge