Customized asian asian tube asian tube made in china api 5l steel pipe

FOB Reference Price:Get Latest Price
  • >=1000 Kilograms
    $1.20
Lead Time:
Quantity(Kilograms) 1 - 10000 >10000
Est. Time(days) 15 Negotiable
Report Suspicious Activity
Overview
Quick Details
Standard:
ASTM, BS, DIN, GB, JIS
Grade Group:
10#-45#, 16Mn, Cr-Mo alloy, Q195-Q345, ST35-ST52, STPG42
Thickness:
1 - 8 mm
Section Shape:
Round
Outer Diameter(Round):
8 - 325 mm
Place of Origin:
Jiangsu, China
Application:
Hydraulic Pipe
Technique:
Cold Drawn
Special Pipe:
API Pipe
Alloy Or Not:
Non-alloy
Supply Ability
Supply Ability:
150000 Metric Ton/Metric Tons per Year
Packaging & Delivery
Packaging Details
1. Bundle packing. 2. Plain end or varnished as per buyer's requestments. 3. Wrapped in waterproof paper 4. Sackcloth with several steel strips 5. Pack in heavy tri-wall boxes
Port
SHANGHAI
Lead Time :
Quantity(Kilograms) 1 - 10000 >10000
Est. Time(days) 15 To be negotiated

Chemical Composition:

 

Standard

 

 

Steel Grade

 

 C(%)

Si(%)

Mn(%)

S(%)

P(%)

A519

1010

0.05-0.15

0.15-0.35

0.3-0.6

≤0.050

≤0.040

1020

0.15-0.25

0.15-0.35

0.3-0.6

≤0.050

≤0.040

1045

0.43-0.50

0.15-0.35

0.6-0.9

≤0.050

≤0.040

4130

0.28-0.33

0.15-0.35

0.4-0.6

≤0.040

≤0.040

4135

0.32-0.39

0.15-0.35

0.6-0.9

≤0.040

≤0.040

4140

0.38-0.42

0.15-0.35

0.7-1.0

≤0.040

≤0.040

 

Other Specification:

Product Name

Seamless carbon steel pipe

Material

Carbon Steel and Alloy Steel

Surface

oiled, Polished, Brightness, Metallic color

Standard

ASTM A106 A53 A192 A179 A210 A519
DIN17175 1629 2391
EN10216-1 10216-2 10305-1
and GB,JIS

Grade

St35,St45,St52,E215,E235,E355,sch10,sch20,A106,A179,A192,A210,T11,T22,T12,AISI4130,SAE1010,SAE1020.etc

Technique 

Cold drawn & cold rolled

Application

1. Automotive and mechanical pipes

2. Petroleum cracking pipes

3. High Pressure Boiler Pipe

4. Low and middle pressure fluid transportation pipeline

5. Chemical fertilizer equipment pipes

6. Heat exchanger pipes

Delivery 

Conditions

1. BK (+C) 

No heat treatment after last cold forming process.

2. BKW (+LC)

After last heat treatment there is a light finishing pass (cold drawing)

3. BKS (+SR)

After the final cold forming process the tubes are stress relieve annealed.

4. GBK (+A)

After the final cold forming process the tubes are annealed in a controlled atmosphere.

5. NBK (+N)

After the final cold forming process the tubes are annealed above the upper transformation 

point in a controlled atmosphere. 

 

 

Our Seamless Steel Pipe are capable of making all of the following products :

Fuel injection Pipe, Oil flow pipeline

Automobile and motorcycle Shock Absorber Pipe

Seat lifter Pipe

Hydrau-cylinder Pipe

Bicycle frame steel pipes

 Mechanical steel pipes for auto and motor parts

 Auto and Motorcycle Parts

 Exhaust Pipe for Generator

 High Heels Steel Pipes

 Campanula Seamless Steel Pipe

 Bike and Bicycle Frame

 Hydraulic System(Oil Pipeline, Motor Engine Pipe)

 Sewing machine and textile machine parts

 Air conditioning fitting

 Gas oil burner pipe

 Oil pipe drilling

 Auto and motor pipe fittings

Gas Spring pipe,motor casing pipe

 

FAQ

Q: How long will it take to produce an order?
A: It is within 30days for the purchasing and production time with container   

order and some days for the sample.  

Q: What is your minimum order?
A: Usually 1 ton for each size, please contact us when you are trying to  

purchase less than container load.

Q: What form of quotation do you offer?
A: FOB Shanghai/(China), CIF and CNF Your destination.

 

Q: What is your payment term? 
A: Payment is 30% deposit, 70% before shipment or 70% L/C at sight for the

container order 100% T/T in advance for LCL order or the sample order.

We accept US dollar,Euro,GBP.etc.

 

Q: Does the sample for free or not?
A: The samples are free if they are common sizes, You need to pay the freight

charge.

 

Q: How do you guarantee the quality of the products?
A: All of our procedures are strictly operated under the ISO 9001, and there

are as many as 6 times of test during the production of each product to

ensure the quality.We have our own test centers, every tubes will be tested

under our testing equipment before package.

 

Q: How do you to package the product?
A: Internal wrapped with plastic foil, external wrapped with polywoven bags,

we use steel belt to pack the outside, polywooden cases or wooden boxes

for thin wall thickness can be offered if required.

 

Q: How about the Third Party Inspection ?
A: We have been working with DNV,TUV,SGS,BV,CO,etc.

 

 


contact information