• Sourcing Solutions
  • Services & Membership
  • Help & Community
About 997 results:
Bitumen (451)
Add to My Favorites Added to My Favorites

Go Green asphalt pothole repair/all weather to use cold mix asphalt

FOB Reference Price:Get Latest Price
US $500 - 645 / Ton | 1 Ton/Tons (Min. Order)
Supply Ability:
100000 Ton/Tons per Day
Seller Support:
Payment protection
On-time shipment
Product quality protection

Quick Details

Place of Origin:
Shanghai, China (Mainland)
Brand Name:
Go Green
Model Number:
Modified Bitumen
first class quality
Softening Point:
Shelf Life:
Unopen to 2 years
Maintenance Time:
No need to maintenance at least 10 years
Suitable for rainy and snowy
20kg bag, 20kg bucket, 1 ton bag

Packaging & Delivery

Packaging Details: 20kg bag, 20kg bucket, 1 ton bag
Delivery Detail: 7-10 days upon receipt of 30% T/T deposit

Go Green asphalt pothole repair/all weather to use cold mix asphalt



Go Green Superior Cold Mix Asphalt is a Superior Permanent Road maintenance material, uses a high performance polymer formulated to guarantee its good workability, applicable in all weather conditions and can works in water, repair both asphalt and concrete driveway, no tools needed, accept traffic immediately after installation.


Application Range


Go Green cold mix asphalt is best choice to repair potholes, utility cuts, road edges, water main breaks, also be utilized as permanent asphalt patch, trench reinstatements, man hole adjustments.


Go Green cold mix asphalt can repair both concrete and asphalt road easily.


Outstanding Features:


1. All weather to use

2. Applicable for rainy and snowy

3. Used in concrete or bituminous pavements

4. No need tar coating material

5. Permanent repair, no need to maintenance at least 10 years 

6. Construction is simple, open to traffic soon

7. Working temperature is -25℃ to 50℃

8. Shelf life unopen 2 years

9. 100% eco-friendly, cold mixing


Packages are available in 20kg bag, 20kg bucket and 1 ton bag






Step 1 Clear


Sweep the base of the pothole of any loose debris by sweeping or raking. Ensure that no large loose rocks are present in the pothole before pothole repair step 2.


Step 2 Pour


Fill the pothole with Go Green cold mix asphalt. Recommended compacted depth is 50mm. If area is deeper than 50mm, compact in layers (no deeper than 50mm per layer).


Step 3 Tamp


When hole is filled, apply a small crown to repair area to allow for additional compaction. Now tamp, or wheel roll for the final time , and you may now open to traffic – immediately!! It’s that simple.



One container can load 1000 pieces of 20kg bags, 48 pieces of 20kg bucket or 20 ton bags.









Our Service



Welcome to contact us, or call us 021-61053027, we will reply to any of your question at the earliest time.


Transaction History of the Supplier

Below is the information about the supplier's transactions conducted via Alibaba.com. If you require further details regarding the transaction data, please contact the supplier directly.

Transaction Overview


Transaction Details

This supplier has completedtransactions with buyers from .

Shipping Destination
Transaction Value
Transaction Date

Send your message to this supplier

Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
Trade Assurance
China (Mainland) | Manufacturer, Trading Company
Transaction Level:
Supplier Assessments:
1 Transactions 200+
The supplier’s transactions conduted via Alibaba.com in the past 6 months.