Go Green cold mix asphalt for instantly pothole repair on asphalt and concrete pavement

FOB Reference Price:Get Latest Price
US $354-565 / Ton | 1 Ton/Tons (Min. Order)
Supply Ability:
10000 Ton/Tons per Month
Port:
Shanghai
Overview
Quick Details
Place of Origin:
Shanghai, China (Mainland)
Brand Name:
Go Green
Model Number:
GAP01
Type:
Modified Bitumen
Grade:
Top
Softening Point:
N/M
Color:
Black
Appearance:
Solid at normal temperature
Storage:
Unopen 2 years
Packaging & Delivery
Packaging Details
20kg bag,20kg bucket,1ton bag
Delivery Time
Shipped in 14 days after payment

Go Green cold mix asphalt for  instantly pothole repair on asphalt and concrete pavement 

 

 

 

Go Green Superior Cold Mix Asphalt is a Superior Permanent Road maintenance material, uses a high performance polymer formulated to guarantee its good workability, applicable in all weather conditions and can works in water, repair both asphalt and concrete driveway, no tools needed, accept traffic immediately after installation.

 

Application Range

 

Go Green cold mix asphalt is best choice to repair potholes, utility cuts, road edges, water main breaks, also be utilized as permanent asphalt patch, trench reinstatements, man hole adjustments.

 

Go Green cold mix asphalt can repair both concrete and asphalt road easily.

 

 

Outstanding Features:

 

1. All weather to use

2. Applicable for rainy and snowy

3. Used in concrete or bituminous pavements

4. No need tar coating material

5. Permanent repair, no need to maintenance at least 10 years 

6. Construction is simple, open to traffic soon

7. Working temperature is -25℃ to 50℃

8. Shelf life unopen 2 years

9. 100% eco-friendly, cold mixing

 

Packages are available in 20kg bag, 20kg bucket and 1 ton bag

 

 

 

 

Step 1 Clear

 

Sweep the base of the pothole of any loose debris by sweeping or raking. Ensure that no large loose rocks are present in the pothole before pothole repair step 2.

 

Step 2 Pour

 

Fill the pothole with Go Green cold mix asphalt. Recommended compacted depth is 50mm. If area is deeper than 50mm, compact in layers (no deeper than 50mm per layer).

 

Step 3 Tamp

 

When hole is filled, apply a small crown to repair area to allow for additional compaction. Now tamp, or wheel roll for the final time , and you may now open to traffic – immediately!! It’s that simple.

 

 

One container can load 1000 pieces of 20kg bags, 48 pieces of 20kg bucket or 20 ton bags.

 

 

 

 

 

 

 

 

 

 

Our Service

 

 

Welcome to contact us, or call us 021-61053027, we will reply to any of your question at the earliest time.