Packaging Details
1. Iron frame to fix equipment
2. All structures fixed on the frame by screws
3. All electric wires and motor put into carton
4. Iron frame and carton covered by stretch film
5. Each package twined with stretch film to prevent water
6. During the unloading, please use forklift(4 ton capacity)to unload the iron frame
Delivery Time
30-60 days after receiving the prepayment