In wall Concealed Cistern for Wall Hung Toilet with dual flush for bathroom

FOB Reference Price:Get Latest Price
US $30-70 / Set | 300 Set/Sets bathroom (Min. Order)
Supply Ability:
30000 Set/Sets per Month bathroom design
Port:
Xiamen
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Fujian, China (Mainland)
Brand Name:
OEM/ODM
Model Number:
CJ720
Feature:
Concealed Tank, Dual-Flush
Type:
Upper Cistern
Toilet Tank Material:
HDPE
Product Name:
concealed cistern
Model No.:
CJ720
Cistern Material:
HDPE
Length:
500mm
Width:
150mm
Heigth:
820mm/1160
Thickness of cistern:
135 mm
Flush Valve:
pneumatic
Approval:
CE, WRAS
MOQ:
300sets
Packaging & Delivery
Packaging Details
international standard packing way
Delivery Time
35-40 days after the order is confirmed
Product Description

OEM products are also welcome!

Sampling Time: about 7 working days, depending on actual raw material and accessories situation.

Prodution Time: usually 45 days for first order.

 

Related Products
 
About Us
Production

 

Packaging

 

Exhibition

 

Certifications

 

FAQ

Q1: What is your product MOQ?

A: Our MOQ for urea toilet seats is 500 sets per item, for PP toilet seat is 1000 sets per item, for cisterns is 300~ 500 sets per item. 

 

Q2: What is your port?

A: Xiamen, China

 

Q3: Can we have our logo on your products?

A: Yes, we welcome OEM/ODM projects. We can not only work as your OEM factory, but also work with you together on developing new projects or products.

Q4: Do you test your products per production?

A: Of course, we have our own professional lab in the factory for the tests of toilet seat, concealed cistern.

e.g. for the toilet seats, we have slam test, rocker test, static loading endurance test, dymatic pressure endurance test, force life test for soft close damper, comprehensive lifecycle test, etc.

 

Q5: What's the payment terms?

A: Generally, we accept T/T, L/C.

Q6: What the lead time for your production?

A: Normally, for toilet seat, the lead time will be around 35-40 days for the first order, and 30-35 days for the following orders; For flushing cisterns, the lead time will be around 40-45 days.