Industrial Water Chiller Machine

  • 1-4 Sets
    $950.00
  • 5-9 Sets
    $930.00
  • >=10 Sets
    $900.00
Quantity:
- + Sets available
0piecesselected, US $in total
View Details
Shipping fee:
Depends on the order quantity.
Lead Time:
5 day(s) after payment received
Contact Supplier
Report Suspicious Activity
Overview
Quick Details
Type:
Chiller
Mounting:
Floor Standing
Condition:
New
Place of Origin:
Shanghai, China
Brand Name:
WINHEE
Model Number:
WHW-35
Operating Voltage:
220/230V-50/60HZ
Certification:
CE.CCC.ISO9001, CE
Product name:
Industrial Water Chiller Machine
Cooling capacity:
3.5KW
Refrigerant:
R410a/R134a/R407c
Power supply:
AC 3P 380V/50Hz
Rated power:
1.9KW
Tank volume:
32L(Max )
Pump Flow:
25L/min
IP Code:
IP 44
Environment Temperature:
5-45℃
After-sales Service Provided:
Overseas third-party support available

Packaging & Delivery

Selling Units:
Single item
Single package size: 
62X48X116 cm
Single gross weight:
130.0 kg
Package Type:
Carton Case The machine dimension:53*47*113.5cm(L*W*H) The packing dimension:62*48*116cm(L*W*H)
Lead Time :
Quantity(Set) 1 - 800 >800
Est. Time(days) 5 To be negotiated

 Industrial Water Chiller Machine

 

Product  Specification

Brand Name

Winhee

Model Number

WHW-35

Type

Water chiller

Color

Customized

Cooling capacity

3.5KW 3000Kcal/h

Rated power

2.5KW

Rated current

7A

Power supply(V,Hz)

AC 3P 380V/50Hz

Dimension

W500*D550*H1000 mm

Water pump flow

25L/min

Pump head

25m

Interface size

1/2”

Water temperature range

Temperature fixed:15-45℃; Indoor temperature: room temperature±T℃,control accuracy±1℃

Environmental temperature range

10~45℃

Max. Water tank capacity

32L

Other

Warranty

12 months

Certification:

CE, 3C, ISO9001

 

The Machine DimensionThe Packing DimensionWeight
53*47.5*113.562*48*116130Kg

1 ) How can I place order?
A: You can contact us by email about your order details, or place order on line.

2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using.

3) What’s the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don’t have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.