LIJIN Manufacture industrial warehouse heavy duty storage steel scaffolding mezzanine floor rack

FOB Reference Price:Get Latest Price
$20.00 - $200.00 / Set | 1 Set/Sets (Min. Order)
Shipping:
Support Sea freight
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Guangdong, China
Brand Name:
Lijin
Model Number:
MP-324
Type:
Multi-Level
Material:
Steel, Q235 steel
Feature:
Corrosion Protection
Use:
Warehouse Rack
Certification:
ISO 9001
Depth:
selective
Weight Capacity:
200kg~500kg/SQM
Width:
selective
Height:
selective, 2.5~5m
Color:
orange blue gray
Surface treatment:
phosphorization
Finish:
powder coated
Loading capacity:
200KG~500KG/SQM
Function:
warehouse
size:
according to the warehoue size
Level:
multi level
Guarantee:
3~5years
Supply Ability
Supply Ability:
1000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
Board in carton,upright and beam bubble form.
Port
shenzhen port

Custom Warehouse Storage Multi-Level  leaning ladder shelf mezzanine floor racking

 

Product Description

 

  Product Description 

 

1.Mezzanine Racking System are widely used in high warehouse, small goods, manual access, access to a larger amount under the circumstances, from the minute use of space. Save the Treasury area. More particularly applicable to auto parts, electronics, light industry, clothing, and other enterprises of the products classified preservation.
2.Mezzanine Racking System medium-shelf shelves or use heavy shelf shelves plus floor as the main support panel (based on the total weight of the negative shelf unit to determine what kind of shelf), plate appearances usually use wood or cold-rolled steel gusset plate and the like.

 

 Product Name industrial warehouse heavy duty storage steel mezzanine floor rack
 Product No. MS
 Max.loading capacity Optional
 Vertical Upright specification Customized
 Boxed Beam specification Customized
 Color Customized
 Material High-quality steel,Q235
 Application warehouse
 Finish Powder coated
 Feature Corrosion protection
 MOQ 1pcs
 Payment Terms T/T ; L/C;Westerb Union
 Delivery Time Shipped in 20 days after payment
 Packing Details Packed in foam
 Certification SGS ISO9001 AS4084:2012
 OEM&ODM Support

 Characteristic

 1.Can enhance the shelf height attic shelves full use of warehouse height, better use of storage space.
 2.Attic shelves shelf dedicated floor laying steel gusset plate, load capacity, good integrity, carrying layer uniformity, smooth surface, easy to lock and other characteristics.
 3.Attic shelves full account of user-friendly logistics, design aesthetics, structure and generous, assembly installation and removal easy, according to the ground, flexible design.
 4.According to various floor design custom installation, can be easily assembled on site, without welding. Attic shelves for storing various types of items.
5.Optional downstairs forklifts, hydraulic lifts, freight elevators, etc. cargo, cargo transport is usually the same layer using a small trolley complete.

Product Display
  Product Display 

 

 

 

Product Case
  Product Case 

 

 

  Product Categories 
1.Heavy Duty Racking 
System >>
2.Middle Duty Racking 
>>
3.Light Duty Shelving >>4.Drive-in Pallet Racking 
System >>
5.Cantilever Racking 
System >>
6.Mezzanine Racking 
System >>
7.Steel Structure 
Platform >>
8.Mold Racking >>
9.Warehouse Wire 
Cages >>
10.Movable Filing 
cabinet system >>
11.Gravity Racking 
System >>
12.Narrow Aisle 
Racking >>
13.Automatic Solid 
Warehouse >>
14.Carton Flow System 
>>
15.Shuttle Racking 
System >>
16.Others >>
  OEM & ODM 

 

Product Structure
  Product Structure 

About Us

Certifications

Production Steps

Factory

Packing & Shipping

Exhibitions

Our Customer

FAQ

 Q1. What is your terms of packing?exhibition
A: Generally, we pack our goods in carton boxs and plastic bubble film.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages 
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.

Q4. How about your delivery time?
A: Generally, it will take 15 to 25 days after receiving your advance payment. The specific delivery time depends 
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and 
the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.

Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
    2. We respect every customer as our friend and we sincerely do business and make friends with them, 
        no matter where they come from.