All categories
Featured selections
Trade Assurance
Buyer Central
Help Center
Get the app
Become a supplier

Mortmain hollow plastic construction formwork for concrete wall

(3 Reviews)

Key attributes

Industry-specific attributes

After-sale Service
Online technical support, Onsite Installation, Onsite Training, Onsite Inspection, Free spare parts

Project Solution Capability
graphic design, 3D model design, total solution for projects

Application
Hotel

Design Style
Contemporary

Other attributes

Place of Origin
Hebei, China

Type
1220*2440*12-20mm

Brand Name
Mortmain

Model Number
MTM-JD

Product name
plastic formwork for concrete slab

Material
polypropylene Plastic

Application
Tall Building ,bridge,tunnel, concrete wall,pillar

Color
white , gray , black and white

Size
1220*2440mm*12-20mm thickness

Weight
12-30kg

Feature
reusable,high hardness,good toughness,anti-abrasion,nondeformed

Type
Plastic Construction Formwork

Usage
plastic Concorete Formwork on wall,pillar

Name
plastic Construction Formwork

Packaging and delivery

Packaging Details
plastic construction formwork /slabs/template design:
according to our customer's requirement

Selling Units:
Single item

Single package size:
20X20X1.8 cm

Single gross weight:
2.000 kg

Lead time

Quantity (pieces)1 - 400 > 400
Lead time (days)10To be negotiated

Ratings & Reviews

No product reviews yet
Go to Store reviews to see reviews for other products

Product descriptions from the supplier

400 - 999 pieces
$42.00
1000 - 1999 pieces
$38.00
>= 2000 pieces
$32.00

Quantity

Shipping

Shipping solutions for the selected quantity are currently unavailable
Item subtotal (0 variations 0 items)
$0.00
Shipping total
$0.00
Subtotal
$0.00

Membership benefits

Quick refunds on orders under US $1,000Claim now

Purchase details
Protection with

Secure payments

Every payment you make on Alibaba.com is secured with strict SSL encryption and PCI DSS data protection protocols

Refund policy

Claim a refund if your order doesn't ship, is missing, or arrives with product issues