• Sourcing Solutions
  • Services & Membership
  • Help & Community
Add to My Favorites Added to My Favorites

New Fashion Design Side Fill Valve With Plastic Shank

FOB Reference Price:Get Latest Price
US $1 - 2 / Piece | 1000 Piece/Pieces Side fill valve (Min. Order)
Supply Ability:
4000000 Piece/Pieces per Year Side fill valve
Port:
XIAMEN
Seller Support:
Payment protection
On-time shipment
Product quality protection
Payment:
More

Quick Details

Type:
Filling Valves
Place of Origin:
Fujian, China (Mainland)
Brand Name:
ALYN
Model Number:
J2105
Installation size:
G3/8" and G1/2"
Material:
POM
Item:
side fill valve

Packaging & Delivery

Packaging Details: PE bag/Blister+color card/Color box up to your choice
side fill valve

side fill valve

*Installation Position : Side
*Fill rate : 0.05MPa : ≥0.05L/S
*Working pressure : ≤1.4MPa
*Only for wash down toilet
*Rotate the screw to adjust water level 

Material           POM       
Installation sizeG3/8" ; G1/2" Plastic shank
Suitable forSiphonic  toilets 
ColorWhite and blue
SamplesSamples are free ,but the freight should be paid by buyers

 

 

 

Company information:

 

 

Production area:

 

Injection and mould equipment:

 

Testing area:

                                                                    Life test

Fill valve: After 250,000cycles no damage

Flush valve: After 75,000cycles no damage

 

                                          High/Low pressure test

The highest dynamic pressure: 1.0Mpa

The lowest dynamic  pressure: 0.02Mpa

No leakage!!

 

                                               Aging test

 

                                   Anti-siphon test

 

 

                                       Holding-pressure test

72 hours static pressure of 1.0Mpa, function normally.

Alyn make random holding-pressure test for each shipment to make sure quality of products to end user!!



 

FAQ

Q1: What is your products range?
1) All fittings for toilet, fill valve, flush valve, push button, lever, bolts, etc.
2) Other bathroom fittings

Q2: How to inspect the finished products?
We inspect all the parts before assembling and 100% testing the fininshed product before packaging based on the ISO9001.

Q3: How many days will samples be finished? And how about the mass production?
Generally, 2-3days for samples making.
The lead time of mass production will depend on quantity. normally,We finish within 15 days

Q4: What kind of package you can provide?
Printing plastic bag,Printing plastic hang bag,Single or double blister with color card,Color box etc.

Q5: Why we choose to cooperate with you ?
We provide reliable quality, competitive price, high valued service to help you earn more market share. We will be your best partner.


Main Advantages of our company

1) More than 8 years R&D experience.
2) More patented new designs.
3) Modern facilities for manufacturing and quality assurance.
4) Professional to make mould for customers with competitive cost.
5) Customized color, package, design.
6) In-time delivery and professional service.
7) OEM service supported.
8) Catalog and free sample for design and quality check.

Transaction History of the Supplier

Below is the information about the supplier's transactions conducted via Alibaba.com. If you require further details regarding the transaction data, please contact the supplier directly.

Transaction Overview

Transactions

Transaction Details

This supplier has completedtransactions with buyers from .

Shipping Destination
Transaction Value
Transaction Date

Send your message to this supplier

Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
China (Mainland)
Transaction Level:
Supplier Assessments:
aisn-detail010176209053