OEM precision tooling powder metal sintered parts metallurgie products

Feedback Ratings
$0.50 / Piece | 1000 Pieces (Min. Order)
Model Number:
TWZC-15
$0.50
- +
available
0piecesselected, US $in total
View Details
Shipping fee:
Depends on the order quantity.
Lead Time:
20 day(s) after payment received
Contact Supplier
Samples - $0.20 /Piece, 1 Piece (Min. Order): Buy Samples
Loading... Add To Cart
Report Suspicious Activity
Overview
Quick Details
Applicable Industries:
Hotels, Garment Shops, Building Material Shops, Machinery Repair Shops, Manufacturing Plant, Farms, Home Use, Construction works 
Place of Origin:
Zhejiang, China (Mainland)
Brand Name:
Twirl
Type:
Casting Parts
Material:
Alloy
Plating:
Nickel
Certification:
DIN
No. of teeth:
2

Packaging & Delivery

Selling Units:
Single item
Single package size: 
27X27X17 cm
Single gross weight:
25.0 kg
Package Type:
Cartons+ plastic case
Picture Example:
package-img
package-img
Lead Time :
Quantity(Piece) 1 - 10000 >10000
Est. Time(days) 20 To be negotiated
Product Description


Product Name
OEM precision tooling powder metal sintered parts metallurgie products 
Material
Powder metal - FN-0205
Technology
Powder Metallurgy - Machining
Standard
ISO9001
Surface Treatment
High Frequency quenching, Oil impregnation
Process Flow
Powder mixing - Forming - Sintering - Oil impregnation - Sizing -Ultrasonic Cleaning - Steam Oxidation - Oil impregnation - Final inspection - Packing
Apperance
No Crumbling, Cracks, Exfoliation, Voids, Metal Pitting and Other Defects
Application
building industry machinery
Products Show
Process

The Advantage of Powder Metallurgy Process


①Cost effective

The final products can be compacted with powder metallurgy method ,and no need or can shorten the processing of machine .It can save material greatly and reduce the production cost .

②Complex shapes
Powder metallurgy allows to obtain complex shapes directly from the compacting tooling ,without any machining operation ,like teeth ,splines ,profiles ,frontal geometries etc.

③High precision
Achievable tolerances in the perpendicular direction of compacting are typically IT 8-9 as sintered,improvable up to IT 5-7 after sizing .Additional machining operations can improve the precision .

④Self-lubrication
The interconnected porosity of the material can be filled with oils ,obtaining then a self-lubricating bearing :the oil provides constant lubrication between bearing and shaft ,and the system does not need any additional external lubricant .

⑤Green technology
The manufacturing process of sintered components is certified as ecological ,because the material waste is very low ,the product is recyclable ,and the energy efficiency is good because the material is not molten.
Our Company

Factory

Our Factory

Workshop

Our Workshop

Warehouse

Our Warehouse

Team

Our Team

Packing & Delivery

Packing Details  : Packing, solid bicycle saddle, 50pcs/carton

Delivery Details : 3-30 days after order of Solid bicycle tire tubes

1. Special logistics packaging
2. Suitable carton size
3. Shock bubble film
Transport


1. Sea Logistics 

2. Air Logistics

3.Road Logistics
Our Advantage

Our Capabilities

1.58,000 sqm factory
2.45T-500T compacting machines
3.5 continously sintering furnaces
4.2ton - 260tons sizing machines
5.Automatic ultrasonic washers
6.CNC Machining Center

Raw material comply with MPIF standard

1.All material source from Tisco, and other natioanl steel factories
2.Plenty of stock in year round
3.Different raw material providers to make sure fast supply
4.Strict raw material inspection

Professional laboratory

1.Universal material tester
2.Brinell hardness tester
3.Density tester
4.All inspection carry out from raw material incoming to final product delivery


Standardized workflow
1.All working procedures comply with ISO9001:2000

FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like