Plastic lid mould

FOB Reference Price:Get Latest Price
US $10,000-10,009 / Set | 1 Set/Sets (Min. Order)
Supply Ability:
1,10 Set/Sets per Month
Port:
Ningbo
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
China (Mainland)
Brand Name:
XiongYi
Plastic Modling Type:
Injection
Color:
all kinds of color
Sizes:
all kinds of sizes
Cavity:
1/1
Design:
According to the customers' requirement
Runner:
Hot/cold
Merchine:
CNC/EMC/WIRE CUTTING etc.
Plastic Material:
PP/PC/PVC/PS etc
Packaging & Delivery
Packaging Details
Wooden case /plywood case for tool .PE bags add export carton for parts
Delivery Time
Delivery the order after 30-45days

Specifications

1.Material:P20/3CR13/718/2316 etc
2.Size:all kin of sizes
3.Runner:cold/hot
4.Good quality
5.Cheaper price

 

 

We are Xiong yi specialized in making molding more than20 years

 

Gerneral mold specifications:

 

1.Name: Plastic lid mould

 

2.Steel of mould cavity&core :P20/718/2316/3CR13 /40cr/2738/NAK80/S136 etc

 

3.Steel of mould base :45#,50#,etc

 

4.Nos of cavity:customized or according to the customers' requirement

 

5.Hardness of cavity&core:30-33HRC

 

6.Hardness of wear parts :30-33HRC

 

7.Core pulling system:motor /oil cylinder/stripping plate,angel,pin etc

 

8.Mould Accessories:DME/HASCO standard

 

9:Manufacture Process:Drawing/sample/product data --Agreement comment--Hand made sample--Design comment--Material purchase and Give product instuction--Material inspection and Mould design--Electrode process and Prorm--CNC,wire cut,EDM--Quality inspection--Finish machining cavity,core,jiggle pin--Quality inspectio--Match the moulds--Quality inspection--polishing--Quality innspection--Cautery veins,plate and Nitrification--Quality inspection--Moulds assembly --Quality inspetion --Try mould--Client approbate--Consignation/maufacture

 

10 Machining center: CNC milling machine -NC wire cutting -NC-EDM and so on

 

11 Mould life time:500000-1000000 shots,or according to the material of steel

 

12.Down payment:Usually 40%before we start working

 

13.R and D:We offer customers the drawings for products and mould structure

 

14.Confirmation:We send the drawings to cusomer to confirm and the customers give us some suggestions

 

15.Testing :Testing the mould to make sure everything is ok

 

16.Lead time:30-45days

 

17.Imported Steel ensured the  long service life of the moulds

 

18.Rowerful cooling system ensured the product forming speed

 

19.Advanced computer simulation technology is adoped to analyze mould runner designing

 

20.Advanced High-precision equipments,High-class R&D team,and strict quality control managment ensured ensured the mould quality