Pre Galvanized Pipe / Steel Pipe / Scaffolding Tube

Feedback Ratings
US $21.50 / Piece | 1500 Pieces (Min. Order)
Quantity:
- + Pieces available
0piecesselected, US $in total
View Details
Shipping fee:
Depends on the order quantity.
Lead Time:
30 day(s) after payment received
Contact Supplier
Report Suspicious Activity
Overview
Quick Details
Standard:
API, ASTM, BS, DIN, GB, JIS
Standard2:
API 5CT, API 5L, API 5DP, ASTM A210-1996, BS 31, DIN EN 10208-1-1998, GB/T 3090-2000, GB/T 14291-2006, JIS G3446-2004
Grade Group:
A53-A369, Q195-Q345
Grade:
A335 P5, A179-C, A335 P1, A209, A226, A135-A, A334, A250, A199, Q235, Q345, Q195, Q215
Thickness:
4 mm
Section Shape:
Round
Outer Diameter(Round):
48.6 mm
Place of Origin:
Tianjin, China (Mainland)
Secondary Or Not:
Non-secondary
Application:
Structure Pipe
Technique:
ERW
Certification:
API
Surface Treatment:
Galvanized
Special Pipe:
Thick Wall Pipe
Alloy Or Not:
Non-alloy
Name:
Pre Galvanized Pipe / Steel Pipe / Scaffolding Tube

Packaging & Delivery

Selling Units:
Single item
Single package size: 
600X50X50 cm
Single gross weight:
2385.0 kg
Package Type:
91 standard packaging
Lead Time :
Quantity(Piece) 1 - 10000 >10000
Est. Time(day) 30 To be negotiated

Pre Galvanized Pipe / Steel Pipe / Scaffolding Tube

 

Commodity

steel pipe 

OD

10-600mm(round)        

thickness

1.2-30mm

length

3-12m or as per customers' requirements

 

material

Q195—Grade B, SS330, SPC, S185

Q215—Grade C,CS Type B, SS330, SPHC

Q235---Grade D, SS400, S235JR, S235JO, S235J2

Q345---SS500, ST52

Standard

 

GB/T13793-1992,GB/T14291-2006, GB/T3091-1993,GB/T3092-1993,GB3640-88

 

BS1387/1985,ASTM A53/A36,EN39/EN10219,API 5L,GB/T9711.1-99 etc

 

zinc coating

pre galvanized steel pipe: 60-150g/m2

hot dipped galvanized steel pipe:200-400g/m2

application

Widely used in Structure, Accessorize,Construction, 

Fluid transportation,machinery parts,the stress parts of the automobile

 tractor parts and so on

 

 

 

Package

1)   Big OD: in bulk

2)   Small OD: packed by steel strips

3)   Plastic bags

4)   According to customer’s requirement

Delivery

Normally 7-20 days after get deposits or according to quantity

Certification

ISO 9001-2008  BV TUV

 

 

advantage

 

1. reasonable price with excellent quality

 

2, abundant stock and prompt delivery

 

3, rich supply and export experience, sincere service

 

 Pre Galvanized Pipe / Steel Pipe / Scaffolding Tube.jpg

 

Pre Galvanized Pipe / Steel Pipe / Scaffolding Tube.jpg

 

Pre Galvanized Pipe / Steel Pipe / Scaffolding Tube.jpgPre Galvanized Pipe / Steel Pipe / Scaffolding Tube.jpg

 

Produce Process

 

 Pre Galvanized Pipe / Steel Pipe / Scaffolding Tube.png

 

Our Services

 Pre Galvanized Pipe / Steel Pipe / Scaffolding Tube.jpg 

Company Information

Company Brief Introduction:

TSX Groupe was founded in 2000,it locates in Tianjin Jinghai County, Da Qiu Zhuang industrial estate. It is a collection of production building steel pipe,adjustable steel prop,ringlock scaffold,  scaffold,H frame scaffold, adjustable base and various accessories professional manufacturer.Our products sell well both at home and abroad.Exported to easted Europe,Middle East,south Asia and many other countries and regions.

 

Why choose us:

1.We are a professional manufacturer with 16 years experiences.

 

2. Our group covers an area of 37000sqm,more than 180 high quality technology employees include 6 engineers.

 

3. We have 6 fully automatic welding production line.High production strength so that the annual output of more than 2 million sets.

 

4. We can assure you the delivery time.

 

5. Our group are certified by ISO,API and etc.

 

6.  Good after-sales service,no dispute

FAQ

- - - 1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container,mixed acceptable .
- - - 2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted).
- - - 3. Q: What's your payment terms?
T/T 30% in advance by T/T ,70% will be before shipment under FOB.
T/T 30% in advance by T/T ,70% against the copy of BL under CIF.
T/T 30% in advance by T/T ,70% LC at sight under CIF.
- - - 4. Q: What's your delivery time?
A: 10-20 days after received the advance payment .
- - - 5. Q: Are you manufacturer or trader?
A: We are the manufacturer of construction materials for decade years ,TSX Group do domestic market and export business.
- - - 6. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing) afforded enough production ability and earlier delivery time.
- - - 7. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
- - - 8. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials.
(1) scaffolding system (cup-lock system, ring lock system, scaffolding steel frame, pipe&coupler system)
(2) Scaffolding pipes (1.5'-2.0')x(0.3-12m), hot dipped galvanized/Pre-galvanized /black. BS1139
(3) Steel pipes (ERW steel pipes, Square/ Rectangular tube ,black annealed steel tube)
(4) Steel coupler (pressed/drop forged coupler)
(5) Steel plank with hooks or without hooks
(6) Steel stair case
(7) Screw adjustable base jack
(8) Construction Metal Formwork

 

Related products
Contact Us

      Click Picture to Send me an Inquiry

   _20180808095212.jpg         _20180808095452.jpg

 

Contact : TOM   GUO

Email : guojing(@)tjtsxgroupe.com

Mobile/Skype/Wechat/WhatsApp: +8613920103001

Welcome to visit our factory at any time!

Variety of models can customized according to your specification requirement.

Back To Home