Prices of prefabricated homes as matel steel building hotel

FOB Reference Price:Get Latest Price
US $180-220 / Square Meter | 1 Square Meter/Square Meters 1*40'HQ (Min. Order)
Supply Ability:
1000 Set/Sets per Month
Port:
Ningbo or Shanghai
Overview
Quick Details
Place of Origin:
Zhejiang, China (Mainland)
Brand Name:
Putian (PTH)
Model Number:
PTJ-8*20A
Material:
steel structure frame+ sandwich panel
Use:
Carport, Hotel, House, Kiosk,Booth, Office, Sentry Box,Guard House, Shop, Toilet, Villa
Main structure:
light C type steel keel,140mm,89mm,70mm
Wall system:
cement board+glass wool+gypsum board
Roof:
EPS sandwich panel+glass wool insulation
False ceiling:
gypsum board
Floor/foundation:
PVC or wooden/concrete
Window:
PVC single glass sliding window
Door:
steel security door or sandwich panel door
Electricity:
custom made
Size:
customized- made
Keyword:
steel building hotel;light steel structure;prefab house
Packaging & Delivery
Packaging Details
1)Flat packing, 4 units in one package, all knocked down, ship in SOC(shipper owned containers)
2)Flat packing, 7 units loaded into one 40'HQ
Delivery Time
30-45days

Hotel Building Plans and Designs

Project Overview
Project time2011.05
Project LocationLas Vegas, United States
CategoryHotel
Product typeLight Steel Structure Building

 

Project Design
FRAME: Light Steel Structure, G550( China Standard, Galvalume Zinc Aluminized)
WALL SYSTEM: PU foamed metal craved board + One-way housewrap + OSB board + light steel sub-keel
+ plaster board (from outside to inside)
ROOF: steel ceiling + light steel sub-keel + one-way housewrap + glass wool + OSB board + colored steel
sheet( from inside to outside)
DECK FLOOR BOARD: light steel mezzanine structure beam + fiber cement board
Manufacturing Process
The structure of this hotel project is light steel structure, all the light steel keel is made by PTH. In order to
ensure the quality, our machine is imported from New Zealand and we use the FRAMECAD software from Australia, meanwhile, all of the light steel structure is galvalume zinc aluminized.
 
                        
 
On Site Installation
            
 
In order to arrange the successful installation, PTH sent to two experienced and skilled engineers to guide
the installation. Meanwhile, installation drawings and pictures is provided, and there is number on each
keel which is helpful for the installation.
        
 
 
Achievement
 
The hotel is successfully installed and putted into use for several years. According to the client’s,feedback,
they are satisfied with the this hotel and the hotel is in good condition.