• Sourcing Solutions
  • Services & Membership
  • Help & Community
About 2357 results:
Bitumen (966)
Add to My Favorites Added to My Favorites

Shanghai Go Green Cold mix Asphalt/ road repair asphalt

FOB Reference Price:Get Latest Price
US $355 - 565 / Ton | 1 Ton/Tons (Min. Order)
Supply Ability:
1000000 Ton/Tons per Month
Port:
Shanghai
Seller Support:
Payment protection
On-time shipment
Product quality protection
Payment:
More
Overview
Specifications
Place of Origin:
Shanghai, China (Mainland)
Brand Name:
Go Green
Model Number:
GAP01
Type:
Petroleum Asphalt
Grade:
top quality
Softening Point:
N/M
Color:
Black
Shelf Life:
Unopen to 2 years
Maintenance Time:
No need to maintenance at least 10 years
Performance:
Suitable for rainy and snowy
Package:
20kg bag, 20kg bucket, 1 ton bag
Packaging & Delivery
Packaging Details:
20kg bag, 20kg bucket, 1 ton bag
Delivery Detail:
Shipped in 14 days after payment
Product Description

 Go Green Superior Cold Mix Asphalt is a Superior Permanent Road maintenance material, uses a high performance polymer formulated to guarantee its good workability, applicable in all weather conditions and can works in water, repair both asphalt and concrete driveway, no tools needed, accept traffic immediately after installation.

 

Application Range

 

Go Green cold mix asphalt is best choice to repair potholes, utility cuts, road edges, water main breaks, also be utilized as permanent asphalt patch, trench reinstatements, man hole adjustments.

 

Go Green cold mix asphalt can repair both concrete and asphalt road easily.

 


 

Product Feature

 1. All weather to use

2. Applicable for rainy and snowy

3. Used in concrete or bituminous pavements

4. No need tar coating material

5. Permanent repair, no need to maintenance at least 10 years 

6. Construction is simple, open to traffic soon

7. Working temperature is -25℃ to 50℃

8. Shelf life unopen 2 years

9. 100% eco-friendly, cold mixing

 

Packages are available in 20kg bag, 20kg bucket and 1 ton bag

 

 

 

Application

 

 

Step 1 Clear

 

Sweep the base of the pothole of any loose debris by sweeping or raking. Ensure that no large loose rocks are present in the pothole before pothole repair step 2.

 

Step 2 Pour

 

Fill the pothole with Go Green cold mix asphalt. Recommended compacted depth is 50mm. If area is deeper than 50mm, compact in layers (no deeper than 50mm per layer).

 

Step 3 Tamp

 

When hole is filled, apply a small crown to repair area to allow for additional compaction. Now tamp, or wheel roll for the final time , and you may now open to traffic – immediately!! It’s that simple.

 

Packaging & Shipping

 One container can load 1000 pieces of 20kg bags, 48 pieces of 20kg bucket or 20 ton bags.

 

 

Certifications

 

 

Company Information

 

 

Our Market

 

Our Service

 

 

Welcome to contact us, or call us 021-61053027, we will reply to any of your question at the earliest time.

 

 

Transaction History of the Supplier

Below is the information about the supplier's transactions conducted via Alibaba.com. If you require further details regarding the transaction data, please contact the supplier directly.

Transaction Overview

Transactions

Transaction Details

This supplier has completedtransactions with buyers from .

Shipping Destination
Transaction Value
Transaction Date

Send your message to this supplier

Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
Trade Assurance
China (Mainland) | Manufacturer, Trading Company
Transaction Level:
Supplier Assessments:
1 Transactions 200+
The supplier’s transactions conduted via Alibaba.com in the past 6 months.
aisndetail010176200121