1.clean and packed it before it is qualified by the QC manager.
2.put drying desiccant inside the machine (protect the machine from wet damage during the transportation).
3.put 6mm cystosepiment outside it and upgrade the thermal contracting film.
4.put into wooden case and steel belt.
Port
tianjin
Supply Ability
Supply Ability
20 Set/Sets per Year industrial bakery equipment prices toast making machine