| FOB Price: | US $1,000 - 1,570 / Ton Get Latest Price |
|---|---|
| Port: | Shanghai |
| Minimum Order Quantity: | 1 Set/Sets |
| Supply Ability: | 10000 Ton/Tons per Year |
| Payment Terms: | L/C,T/T,Cash or ESCROW |
| Standard: | GB | Grade: | Q345 | Dimensions: | 3.048m Each Bay |
| Place of Origin: | Jiangsu China (Mainland) | Brand Name: | BAILEY | Model Number: | CB200-JSBL-001 |
| Type: | Heavy | Application: | Steel Structure Bridge |
| Packaging Detail: | 40 standard containers |
| Delivery Detail: | 3 weeks after prepayment |
1 Bailey Type assembly highway bridge
2 Portable pre-fabricated truss bridge
3 Factory export directly
4 Use unskilled labor
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering. The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges. The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc
| Product/Service (We Sell): | bridge,bailey bridge,steel bridge,temporary bridge | |
| Number of Employees: | 101 - 200 People |
| Main Markets: | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Eastern Asia Western Europe Central America Northern Europe Southern Europe South Asia |
|
| Main Customers: | Nepal Army Goverment,Burma Construction Ministry,Iraq Government | |
| Total Annual Sales Volume: | Above US$100 Million | |
| Export Percentage: | 51% - 60% | |
| Total Annual Purchase Volume: | US$1 Million - US$2.5 Million |
| Factory Size (Sq.meters): | 1,000-3,000 square meters | |
| Factory Location: | NO.2 Jingwu Road,Dingmao District,Zhenjiang,Jiangsu,P.R.China | |
| Number of Production Lines: | 10 | |
| Number of R&D Staff: | 11 - 20 People | |
| Number of QC Staff: | 5 - 10 People | |
| Management Certification: | ISO 9001:2008 | |
| Contract Manufacturing: | OEM Service Offered Design Service Offered Buyer Label Offered |
| Do you want to know more about this company before you make a deal? Request an Assessment Report. |
| Supplier Assessment Reports are detailed on-line reports about the supplier's capabilities. It helps you get all the information you need to trade confidently with suppliers. |