150 cc GO KART Steering Wheel Assembly set Tie Rod Rack Adjustable Shaft

FOB Reference Price:Get Latest Price
$35.00 - $68.00 / Set | 1 Set/Sets (Min. Order)
Shipping:
Support Sea freight
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Zhejiang, China
Brand Name:
TZBRT/OEM
Model Number:
Steering Wheel Assembly
Material:
PU, Polyurethane and Iron
Diameter:
Custom
Model:
For 150cc Go Kart
Usage:
Go Kart Steering Wheel
Quality:
High performance
Size:
44 cm*44 cm*10 cm
cpno:
FXJ.00002
Supply Ability
Supply Ability:
10000 Set/Sets per Month
Packaging & Delivery
Packaging Details
150 cc GO KART Steering Wheel Assembly set Tie Rod Rack Adjustable Shaft
1) carton with pallets.
2) customized color box with pallets
3) one set G.W. is 5.5 kg
4) size:45 cm*45 cm*12 cm.
Port
NINGBO/SHANGHAI

150 cc GO KART Steering Wheel Assembly set Tie Rod Rack Adjustable Shaft 

Product Description

This is the 150 cc Go Kart steering wheel assembly set includes tie rod, steering rack and adjustable shaft. 
The package is heavy duty and the diameter for the steering wheel is 11.5 inches.

the end to end length range after the tie rod connected with the steering rack is from 39.5 inches to 42 inches.

the end to end length range after the two adjustable shafts connected is from 13.25 inches to 15.25 inches.

 

FXJ.00002 (10)FXJ.00002 (15)

 

Our company

HTB1tKjoIpXXXXa9XXXXq6xXFXXXD

      Wenling Mingtu Machinery Factory was founded in 1998. We are a branch of Bright Holding Group Limited and located in Binhai Industrial Area, Taizhou, Zhejiang Province. We have professional engineers and management team in the producing of the scooter and motorcycle parts for U.S.A, Russian, Europe, Brazil, and other countries. We have enough ability to satisfy different requirements from yours in this field. Who could bring a lot of international experience and professional and an unparalleled level of service for you.

Our Services

 

Packaging & Shipping

IMG_1080617560991925680743QQ20160205103233

FAQ

Q1. How to pay?

A: TT, PAYPAL, WEST UNION, DP, DA, Credit card up to you.

 

Q2. What is your term of delivery?

A: EXW, FOB, CFR, CIF, DDU.

 

Q3. How about your delivery time?

A: Generally, it will take 24-48 hours after receiving your advance payment. Some is one week. The specific delivery time depends on the items and the quantity of your order.

 

Q4. How to produce customized products?

A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

 

Q5. How to get a sample?

A: We can supply the sample if we have ready parts in stock

 

Q6. Do you test all your goods before delivery?

A: Yes, we have 100% test before delivery.

 

Q7: How do you make our business long-term and good relationship?

A: 1. We keep good quality and competitive price to ensure our customers benefit ;

    2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.