16Vdc 1A 1000ma Power Adapter 16V 1A AC Adapter UL Listed Certified 2.1mm 5.5mm DC connector

FOB Reference Price:Get Latest Price
$2.00 - $4.20 / Pieces | 10 Piece/Pieces (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Guangdong, China (Mainland)
Brand Name:
YHY
Model Number:
YHY-16001000
Output Type:
DC
Connection:
Plug In
Output voltage:
16VDC
Output current:
1A
Output power:
16W
Efficiency:
82%
Color:
Balck/White
DC connector:
male OD5.5mm*ID2.1mm*L10mm
DC Cable:
1.2M Length(optional)
Input Frequency:
50Hz-60Hz
Certificate:
UL,cUL,CE,GS,CB,TUV,KC,SAA,C-tick,Rohs,FCC,
Warranty:
2years
Supply Ability
Supply Ability:
100000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
White box packaging
50pcs/8.5KG/Carton
36*29.5*25CM
Port
ShenZhen
Video Description

16Vdc 1A 1000ma Power Adapter 16V 1A AC Adapter UL Listed Certified 2.1mm 5.5mm DC connector

Product Description

Product description for 16Vdc 1A 1000ma Power Adapter 16V 1A AC Adapter UL Listed Certified 2.1mm 5.5mm DC connector

Input:100-240Vac
frequency:50/60Hz
Output voltage:16V
Output current:1A
Power:16W
Color:Black/White
DC cable:1.2M
Connection:Desktop
Plug Type:EU/UK/AU/US/KC
Dimension :93.5x47x34mm
DC connector:male OD5.5mm*ID2.1mm*L10mm

Key Market Segments & Applications:

We have DC 5-36V AND, 0.1A-10A, 3W-120W adapters.Lead Trend IC,YHY uses world famous brand IC from leadtrend who is an industry leader,Applied to LED, LCD, guitar, Voice robot, POS machine, printer, toy car, Smart home, loudspeaker, Battery, massager, wireless microphone, LED Showcase, toy plane, massager, laptop etc.Overvoltage Protection, Overload Protection,Short Circuit Protection, Pass EMC Certification,Label Made By Laser Marking Machine,Any Logo can be added.

Popular products
Our Services
  • Our sample delivery time is 3 days.
  • Our warranty is 3 years.
  • Our product defect rate is 3%.More than 3% of defective products will be refilled.
  • OEM&ODM, any your custo mized lightings we can help you to design and put into product.
  • Distributoership are offered for your unique design and some our current models,Protection of your sales area, ideas of design and all your private informatio.
  • Your inquiry related to our products or prices will be replied in 24hrs.Well-trained and experienced staffs to answer all your enquires in fluent English.
  • The delivery time of 100-500PCS is 7 workdays, the delivery time of 500-1000PCS is 10 workdays, the delivery time of 1000-2000PCS is 12 workdays, and the delivery time of 5000PCS is 20 workdays.
Certifications

We have a complete certificate:UL,CUL,FCC,CLASS 2,DOE VI,ISO9000 UL62368,S-MARK,SAA,C-tick,RCM,CCC,KC,PSE,CE,CB,GS,ROHS for your!

Company Information

Shenzhen Yinghui Yuan Electronics Co.,Ltd is a leading manufacturer of power supplies in China

-Since 2007

-Real Service From Real PeopleTM

-Global certifications,ISO 9001 Quality management

-More Than 2000 clients from all over the world

Our products are widely used by led lighting,3D Printer,Laptop,loudspeaker box,digital products,house-hold appliances,security products,etc

 

Packaging & Shipping

 

FAQ

1.Q: Do you offer samples for testing?

 A: Yes,we offer FREE samples for testing,shipping cost paid by buyer.

2.Q: What is the warranty?
A:All power supplies come with 3years guarantee.

3.Q:Do you have certificates for your products?
A :Yes,we have UL/CUL,FCC,RoHS,CE,KC,SAA,TUV GS,PSE,KCC,NOM,S-Mark,BSMI Certifications.

4.Q: Can you design the new housing based on our design?
A:We have professional design team to meet any of your request.one week make up sample. 30days sample test 45days start to MP.

5.Q: What's the main product of you factory?
A: We are the supplier of switching power supply for 0-150W, including wall plug adapter,battery charger,desktop adapter.

6.Q: Do you have some new product coming?
A: Yes,we will post new products in our website www.yhypower.com and inform all customers.

7. Q:What's your payment item?
A: Our standard payment is T/T in advance, Credit Card , E-Checking, Paypal and Western Union.

 

8.Q: What's your lead time?

A: 3workdays for sample ready,12days for 1000pcs,18days for 5000pcs…

 

9.Q: How do you control the quality?

A: Each product is 200% should pass 7progress testing,after OQC inspection then packing. 

 

10.Q: What's your lead time?

A: 3workdays for sample ready,12days for 1000pcs,18days for 5000pcs…

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like