Packaging Details
Packaging Details
Electric Laboratory Equipment Muffle Furnace
1.The 1700c electric sintering kiln was warped with enrivonmental plastic stretch film, then fixed well on the fumigation-free pallet
2.Tailored polywood case, coupled perfectly with the pallet
3.Filled with polyfoam, fit well between the furnace body and the case in all sides
4.Easy-to-identify double-sided outer box print logos and shippment marks
Delivery Time: 15 working days against receiving advanced payment
Port: Shanghai/Qingdao