200kw-2000kw Natural / Bio Gas Generator Electric Start Natural Gas Home Generators

Free Inspection
FOB Reference Price:Get Latest Price
We offer premium service for Trade Assurance orders. Learn more
1 Set/Sets Natural Gas Generator (Min. Order)
Supply Ability:
1000 Set/Sets per Year Natural Gas Generator
Port:
shanghai,chongqing,shenzhen,ningbo
Overview
Quick Details
Place of Origin:
Chongqing, China (Mainland)
Brand Name:
Seatrend
Model Number:
ST-T2
Output Type:
AC Three Phase
Speed:
1000/1200RMP
Rated Power:
20-1000(KW)
Rated Voltage:
400(V)
Rated Current:
50(Hz)
Place of Origin::
Chongqing China (Mainland)
Brand Name::
Seatrend
Frequency::
50/60HZ
Rated Current::
50(Hz)
Rated Voltage::
400(V)
Packaging & Delivery
Packaging Details
Standard exporting package OR according to your requirements
Delivery Time
10-20days

200kw-2000kw Natural / Bio Gas Generator Electric StartNatural Gas Home Generators
 

 

 

 

 

1) Rated power from 8kW to 1100kW
2) power by famous and good quality gas engine and alternator
3) Longer life: natural gas engine has a life of over several years if it is properly operated and maintained
4) Low operation cost: natural gas has a rich reserve with low cost and a high rate of return
5) High profit: low operation cost, supply of electricity and thermal power at the same time, low maintenance cost
6) Coupled with brushless alternators of Leroy Somer / Engga
7) Well performed control system, high quality monitor instrument, with sound and light alarm devices, auto shutdown
8) Protection function: over-current, under-voltage, auto-regulate voltage, reverse power
9) Monitor function: speed, water temperature, lube-oil temperature, lube-oil pressure, exhaust temperature                    
10) Gas consumption: less than 0.33cbm/kWh 
11) Supply connection: 3 phase, 4 lines
12) Rated voltage: 400V
13) Rated speed: 1,500rpm/1,800rpm
14) Rated frequency: 50Hz / 60Hz
15) Rated power factor: 0.8
16) Exciting way: brushless
17) Starting mode: 24V DC electric starting system
18) Cooling mode: closed-circuit cooling system packing in wooden case

 

 

 

 

 

 

Advantage:

1. Low MOQ: It can meet your promotional business very well.

2. OEM Accepted: We can produce any your design.

3. Good Service: We treat clients as friend.

4. Good Quality: We have strict quality control system .Good reputation in the market.

5. Fast & Cheap Delivery: We have big discount from forwarder (Long Contract).

 

 

Check below for more information on placing an order

1. Inquiry-Professional quotation.

2. Confirm the price, lead time, artwork, payment term etc.

3. Freedom sales send the Pro forma Invoice with freedom seal.

4. Customer make the payment for deposit and send us Bank receipt.

5. Initial Production Stage-Inform the clients that we have got the payment, and will make the samples according to your request, send you photos or Samples to get your approval. After approval, we inform that we will arrange the production & inform the estimated time.

6. Middle Production-send photos to show the production line which you can see your products in . Confirm the estimated delivery time again.

7. End Production-Mass production products photos and samples will send to you for approval. You can also arrange the third party Inspection.

8. Clients make payment for balance and Freedom Ship the goods .Also can accept payment term-Balance against B/L Copy Or L/C payment Term. Inform the tracking number and check the status for clients.

9. Order can be say “finish” when you receive the goods and satisfy with them.

10. Feedback to Freedom about Quality, Service, Market Feedback & Suggestion. And we can do better.

 

 

We adopt standrad exporting package,use environmental protection materials to make

 sure the package is suitable to long distance transportation.

Our customers have a wider range of processing choices for transportation mode:

 By Express ( FedEx, UPS, DHL, TNT, EMS, etc... )
--- Advantage: Fast ( takes about 7 - 10 days in the delivery ), door to door
--- Disadvantage: A little expensive
By Air Transportation
--- Advantage: Fast ( takes about 8 - 12 days ), a little cheaper than Express.
--- Disadvantage: You need to take the goods from the airport by yourself.
By Sea ( Ocean ) Transportation
--- Advantage: Much cheaper than Express or Air transportation.
--- Disadvantage: Slow and you need to take the goods from your destination port by yourself.