300L 500L 1000L micro brewery equipment,beer brewing system for sales

FOB Reference Price:Get Latest Price
$17,000.00 - $59,000.00 / Sets | 1 Set/Sets 300L 500L 1000L micro brewery equipment,beer brewing system (Min. Order)
Model Number:
HL-200-1000
Lead Time:
Quantity(Sets) 1 - 5 >5
Est. Time(days) 20 Negotiable
Report Suspicious Activity
Overview
Quick Details
Processing:
Fermenting Equipment, Fermenting Equipment
Condition:
New
Place of Origin:
Shandong, China (Mainland)
Brand Name:
HL
Processing Types:
wheat,barley
Voltage:
220V/380V
Power(W):
15-70Kw Depends
Dimension(L*W*H):
Capacity Request
Weight:
200KG-2000KG
Certification:
CE ISO UL
Product Name:
300L 500L 1000L micro brewery equipment,beer brewing system for sales
material:
red copper,SS304/316
type:
automatic
workers:
3 workers
rawmaterials:
wheat,barley
description:
beer equipment
Heating method:
Steam Heating, electrical heating, direct fire heating
fermenter cone:
60 or 75 degree
thickness of insulation:
80-100mm
After-sales Service Provided:
Engineers available to service machinery overseas
Warranty:
2 years
Supply Ability
Supply Ability:
30 Set/Sets per Month 300L 500L 1000L micro brewery equipment
Packaging & Delivery
Packaging Details
standard exporting package
Port
Qingdao
Lead Time :
Quantity(Sets) 1 - 5 >5
Est. Time(days) 20 To be negotiated

300L 500L 1000L micro brewery equipment,

beer brewing system for sales 

 

 

Product Description

 1.Brewery equipment for sale ,beer equipment/brewing systems

bewery machine equipment from china for small business

home/restaurant/pub beer brewing equipment

1.Capacity:500L/D
2.Usage:for brewery pub hotel or restaurant
3.Control:PLC
4:Materials:Red copper,s304

 

 

2.The main configuration of the complete brewery production line:

 Milling system      Saccharification system      Fermentation system 

Refrigeration system    CIP Washing and sterilization systemControl system

 

3.Technological specification:

 

Outside surface

Stainless steel or red copper,THK:1.5mm-3mm

Inner surface

S.S.304,THK:2mm-4mm

Top shape

Seal head or conical head

Heating method

electricity/Steam

Insulation layer

Protected by polyurethane,THK:70-100mm

Polishing

≤0.4µm

Manhole

Side upward or your requirements

Plate heat exchanger

4m²

Agitator

Raking system conneted into a top reducer

 

 

4.The output of Beer making machinery pls as a reference:

daily output

100L

200L 

300L 

500L

600L

800L

1000L

2000L

3000L

5000L

unit type

HL100

HL200

HL300

HL500

HL600

HL800

HL1000

HL2000

HL3000

HL5000

floor space

15

20m²

25m²

45

55 m²

70m²

80

120

150m²

250m²

power

8KW

12KW

20KW

35KW

35/15KW

35/15KW

35/15KW

65/15KW

65/15KW

65/15KW

Beer production period

10-12 days

10-12 days

10-12 days

10-12 days

10-12 days

10-12 days

10-12 days

10-12 days

10-12 days

10-12 days

 

5.Technical parameters & relevant services

1. Output: 100 L/Batch

2. Square for work shop: 25 m2 and 2.5 m high

3. Installed Capacity: 20 Kw

4. Voltage / Frequency (3 phase): 380V / 50Hz or we can design it according to your actual requires.

5. Workers Required: 1-3 Workers

6. Warranty: At least 5 year from the date of completion of the commissioning.

7. Installation/Operation/ Service/ Maintenance Manual: Provided In English

 

 

 

 

 

PRE-SHIPMENT INSPECTION INCLUDES

a). Supplier should examine whole line at supplier’s factory before shipment;

b). Supplier has to guarantee each equipment’s quality;

c). All raw materials will be provided if the customer need for charging suitable fees.

EACH CLIENT CAN ENJOY THE FOLLOWING 7 SERVICES

a). Free consultation service before, during, and after sales;

b). Free project planning and design services;

c). Free debugging of equipment until everything is functional;

d). Free management of equipments' long distance shipping;

e). Free training of equipment maintenance and operating personally;

f). Free new production techniques and formulas;

g). Provide 1 year complete warrantee and life-time maintance service;

 

INSTALLATION SUPERVISION AND COMMISSIONING-Including salaries based on 40 hours per week as well as accident-and health insurance for:

1 Engineer for the duration of two or three weeks in total.

And he will install and debug the equipment. Give the workers guiding and technical training.

 

Period of installation:

The total length of the installation time depends on customer cooperation degree and site condition. A possible delay of the installation period will be additionally invoiced.

 

Packaging & Shipping

 

Company Information

 

 

 

Certifications

 

 

Contact us

 

 

 

 

 

 

 

 

 

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like