3m3 China small mini home portable assembly biogas digester plant biogas equipment for cooking and generating

FOB Reference Price:Get Latest Price
$100.00 - $130.00 / Cubic Meters | 3 Cubic Meter/Cubic Meters (Min. Order)
Lead Time:
Quantity(Cubic Meters) 1 - 1000 >1000
Est. Time(days) 7 Negotiable
Customization:
Customized logo (Min. Order: 5 Cubic Meters)
Customized packaging (Min. Order: 5 Cubic Meters)

More

Graphic customization (Min. Order: 5 Cubic Meters) Less
Report Suspicious Activity
Overview
Quick Details
Brand Name:
Sunrise biogas
Model Number:
SR-3m3
Place of Origin:
Guangdong, China (Mainland)
Application:
Cooking Fuel & Heating & Electricity generation
Calory (J):
999999999
Hydrogen Content (%):
5
Methane Content (%):
75
Nitrogen Content (%):
0
Sulphur Content (%):
0
Type:
DIY Assembly
Function:
Organic waste treatment
Feature:
Anti-UV, Anti-aging
Warranty:
5 years
Installation time:
Simple installation within 2 hours
lifetime:
Over 15 years
Certificate:
CE / ISO
Package:
Standard carton package
Customization:
Acceptable
Product:
Small mini home portable assembly biogas plant
Supply Ability
Supply Ability:
1000 Set/Sets per Month
Packaging & Delivery
Packaging Details
3m3 China small mini home portable assembly biogas digester plant biogas equipment for cooking and generating is packed by carton.
Port
Shenzhen
Picture Example:
package-img
Lead Time :
Quantity(Cubic Meters) 1 - 1000 >1000
Est. Time(days) 7 To be negotiated

3m3 China small mini home portable assembly biogas digester plant biogas equipment for cooking and generating

 

Product Description

 

 

 

 

 

 

 

Technical parameters

 

Digester ModelSR-3M3SR-5M3SR-10M3SR-15M3
Digester dimension L*W*H (mm)1620*1320*17601940*1940*18103880*1940*18105820*1940*1810
Weight (kg)6886140182.8
Packing volume (m3)0.380.450.640.71
Daily gas production (m3)1.52.557.5
Effective gas storage capacity (m3)1.5-22.5-35-67.5-9
Fermentation effective volume (m3)1.5-22.5-35-67.5-9
Waste Treatment Capacity (kg)Food waste3660120180
Pig manure4575150225
Cow dung65110220330
Chicken manure3560120180
Vegetable waste68115230345

 

System flow

 

 

Company Information

 

Exhibition show

 

 

Certifications

 

Packaging & Shipping

 

FAQ

 How do we cooperate to build biogas plant ?

Part One: We need the data of raw material from your side.

1.  What’s kind of raw material to be treated by biogas plant?

1.Food waste     2. Green waste     3. Animal waste     4. Human waste

5.Bird waste      6. distillery waste water    7. Other

2.  How much waste per day?

Please inform us the quantity of the waste per day. We could help you figure out the gas production from the waste per day. And then we suggest the volume of the digester tank.

For example, you could inform us the quantity of the pigs in your pigsty.

We suppsoe there are 500 sow pigs.

Daily Feces of the sow pigs is 3Kg per day. So, 500×3= 1500Kg pig manure per day.

22.23Kg pig manure produce 1 m³ biogas. 1500Kg÷22.23= 67.5m³ biogas.

We would prefer suggest the 150m³ biogas plant for this solution on the condition of 25~30 degrees Celsius.

Part Two: What is the usage of biogas for your project?

1. Cooking       2. Generating eletricity

3. Cooking and Generating eletricity    4. Other 

For Generating eletricity, 1m³  biogas produce 1.5KWH eletricity.

500 sow pigs can produce 67.5m³ biogas per day that is produced 101.25KWH eletricity per day.  It able to run the 10KW biogas generator for 10 hours per day.

Part Three: We make the proposal for you.

Sunrise Econergy specialize in family size biogas plant and the medium size biogas for farms and schools and factories. We have different recommend to you according to your situation.

Part Four: We guide you to build the biogas plant.

Buyer is responsible for the civil engineering, installation while supplier will be in charge of design, guidance,purchasing equipment and technology service. 

According to your own situation, we support the civil engineering drawing of your biogas plant to you when you confirm the order to us. If you are asking for us, we could send the technical personnel to your construction plant at site for the installation guidance. During the service stage, buyer will be responsible for the boarding fee, transportation fee for the technician.

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like