500l red copper tank / brew kettle used brewery equipment for sale

FOB Reference Price:Get Latest Price
$9,000.00 - $20,000.00 / Sets | 1 Set/Sets (Min. Order)
Model Number:
ys-500l
Report Suspicious Activity
Overview
Quick Details
Processing:
Fermenting Equipment
Condition:
New
Place of Origin:
Shandong, China (Mainland)
Brand Name:
YUESHENG
Processing Types:
Alcohol
Voltage:
220v/380v/440v/adjustable
Power(W):
0-80KW
Dimension(L*W*H):
Capacity Request
Weight:
100-5000kg
Certification:
CE ISO
Warranty:
3 years
After-sales Service Provided:
Field installation, commissioning and training
Material:
Stainless Steel 304/316
tank thickness:
inner, 3mm. cladding, 2mm
Application:
beer brewing equipment
Control system:
DCS, PLC
Heating way:
electical, steam, direct fire
insulation layer:
PU or rockwool
insulation thickness:
80-100mm
material thickness:
inner, 3mm cladding, 2mm
Capacity:
200l
Name:
500l red copper tank / brew kettle used brewery equipment for sale
Supply Ability
Supply Ability:
50 Set/Sets per Month
Packaging & Delivery
Packaging Details
All major tanks, vessels or equipment will be packaged will be painted steel frames in such way as suitable for sea transportation; all accessories, pipes and fittings will be packaged in steel frame case.
Port
QINGDAO

Shandong yuesheng beer brew company

 

Welcome to visit our company and cooperation with us. waiting for you~~~

 

Product Description

500l red copper tank / brew kettle  used brewery equipment for sale

 

Application

 

the equipment is used in brewing in many kinds of beer, and through brewery euqipment, the beer is more tasty, our product is main aply to home, pub, hotel, restaurant and laboratory, if you want, we can provide.

 

brewing process

 

 

Before you inquiry, please consider some questions and read informations as follows:

 

*What heating methods do you want? (electrical, steam, direct fire)

*What vessels of brewhouse do you want? (2 or 3 vessels, main different is with or wihtout hot water tank), or other requirement

*How many fermenters do you want? (usually 6 fermenters is standard configuration)

*Do you need bright beer tank?

*Where will you installed it? (pub, hotel, restaurant, home, or other places)

*What material do you need? (stainless steel or red copper)

**If you are not sure, don't worry, we also can make the best choice for you.

 

 

configuration

 

*milling system

*brewhouse system

*fermentation system

*cooling system

*CIP system

*control system

 

basic information

 

*material: sus304/ 016, red copper

*thickness: inner, 3mm cladding, 2mm

*insulation layer: PU or rockwool (if use direct fire, need rockwool insulation)

*thickness: 80-100mm

*manhole: on top or side

 

 

 

 the 500l red copper tank / brew kettle  used brewery equipment for sale standard configuration

 

Main systemmain partsspecifications
milling systemmalt milling, 100kg/h

with motor,belt and belt pulley

brewhouse system

mash/ lauter tank, 500L

kettle/ whirlpool tank, 500L

hot water tank(optional), 500L

wort pump,1m3/h

hot water pump(optional), 1m3/h

heat exchanger, 10m2

Stainless steel 304/ 316

Surface brushed, welding line polish sanding light belt; Top manhole

Mechanical agitation with frequency

Temperature sense probe

milled false bottom

2 or 3 vessels

 

fermentation system

fermenters, 500L

yeast adding tank, 10L

Stainless steel 304/ 316

fermenters cone: 60 or 90 degree

conical vertical tank

Dimple type glycol cooling jacket

Top safety valve; Top manhole

With rotary CIP spray balls and arm

Temperature sensor; Sample valve

Mechanical pressure valve

Separate outlet for yeast and clear beer

Pressure gauge

cooling system

glycol tank, 500L

chiller, 5HP

glycol pump, 1m3/h

Surface brushed,  thermal well

top round shape man-hole door

CIP system

sterilization tank, 1000L

alkali liquor tank, 1000L

CIP pump, 1m3/h

 

welding seams brushed

electric heating element(alk tank need)

stainless steel 304

 

 

control system

control cabnient, assorted

DCS or PLC controller

power control

temperature display centrally

brewhouse manual control

fermentation tank separate control with digital controller

heating methods

electrical

steam

direct fire

electrical(220/ 380/ 440/ adjustable)

steam boiler

 

 

 

detailed images

 

 

 

 

 

with others compare

 

 

 

 

Certificates

 

  

 

 

 

Packaging & Shipping

 

All major tanks, vessels and equipment will be packaged with painted steel frames in such way as suitable for sea transportation; All accessories, pipes and fittings will be packaged in steel frame case.

Our Services

 

 Pre-sale service:


1. The 24hours marketing team service.
If you are interested in any product, please don't hesitate to contact us. We will quote you,and give you all the details you need at first time.
2. We can provide company’s qualification certification and the drawings.
All of our products are passed CE, TUV, GMP , ISO, FDA test. We can show you our qualification and certification. And we can provide the drawings to make you use our products well as quickly as possible.


After-sale service:


1. We provide long-term after-sale service.
We don't just provide Mini Brewery Beer Manufacturing Plant For Brewing Mash Tun Brew Kettle, the service after sale issame important for us.
2. Owing to the quotation of our equipment is FOB price which excluded charges of door-to-door service. Thus, if necessary, we can appoint our technician to debug the machine with air ticket, visa, accommodation and labor cost provided by your party. Or you can send your technician to our company to learn techniques.

FAQ

Why choose us:

 

1.Specialist manufacturer 

We have own factory,we get CE certification. We specialize in manufacturing beer brewing equipment.

 

 

2.Quality and price 

We have professional purchasing team. Comparing multiple vendors,then choose best raw  materials and the most preferential price. We have skilled worker and strict quality control  system,provide the best quality products to our customers.

 

 

3.Convenient transportation 

Our company is located in Jinan,Shandong,which is near Qingdao port .It just take 2 hours  from our factory to Qingdao port.

  

 

4.Clear order process 

We have clear order process. From mails &calling→→order confirmed →→make advance  payment→→workshop produce→→pay the balance→→deliver goods→→buyers receiving  confirmation→→satisfaction survey.

 

 

5.Quality of service

We will provide photos to make our customers know the order status. Of course,we welcome  our customers to our factory to inspect any time.

 

 

If you have any problems, you also can find me as picture

~~ welcome contact me~~~

 

 

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like