ASTM A252 Gr. 1 DN 350 sch60 PIPE CARBON STEEL ERW / SSAW PIPE

FOB Reference Price:Get Latest Price
$630.00 - $690.00 / Tons | 1 Ton/Tons (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Standard:
API, ASTM, DIN, JIS
Standard2:
API 5L, ASTM A53-2007, ASTM A252-1998, DIN 17175, JIS G3444-2006
Grade Group:
10#-45#, 16Mn, A53-A369, Q195-Q345
Grade:
20#, 16Mn, A106(B,C), A269, A333, Q235
Thickness:
1.24 - 30 inch
Section Shape:
Round
Outer Diameter(Round):
21.3 - 1219 mm
Place of Origin:
Hebei, China (Mainland)
Application:
spiral seam submereged arc welded pipe
Technique:
Hot Rolled, ERW
Certification:
iso
Surface Treatment:
bituminous epoxy paint
Special Pipe:
API Pipe
Alloy Or Not:
Non-alloy
Secondary Or Not:
Non-secondary
Brand Name:
klingmetal
Surface:
black coating
OD:
21.3-1219.2mm
WT:
1.24-30MM
type:
welded
place of origian:
china
Supply Ability
Supply Ability:
20000 Ton/Tons per Month
Packaging & Delivery
Packaging Details
in Bundles/in Wooden Box/in wooden pallet or as Your Requirement
Port
china mian port
ASTM A252  DN 350  SCH 60 spiral seam submereged arc welded pipe
 

welded carbon steel pipe
1. Material:  20# , 16Mn, A53( A, B) , A106( B, C) , A333, 10# -45# , A53-A369, A53B, API 5L G 
2. Standard:  ASTM A53-2007, ASTM A333-2005, ANSI B36.10M-2004, ASTM 
3.  Size: 1/2" to 48" WT:1~~30mm

4. Large product capacity:500,000TON/YEAR
5. High quality and good price

 

 

Production

 Steel Pipe
 SCH10-XXS

 Brand

KINGMETAL

 Standard

ASTM A53-2007, ASTM A333-2005, ANSI B36.10M-2004, ASTM

 Out Diameter

 1/2"--48"

 Wall Thickness

SCH5--SCH××S

 Grade

20# , 16Mn, A53( A, B) , A106( B, C) , A333, 10# -45# , A53-A369, A53B, API 5L GR.B

 Length

 5.8m--11.8m or according to customer’s requirement.

MOQ

15 tons

 Plade of Origin

 China

Port

TianJIn,ShangHai,GuangZhou,China

 Technique

 hot rolled 

 Usage

 1.  Low and middle pressure fluid transportation pipeline

 2.  Casing Tube

 3.  Boiler Pipe

 4.  Petroleunm and natural gas industry

 5.  Chemistry industry

 6.  Electric industry

 Package

 1.  Bundle pack.  Bevelled end or plain end or warnished as per buyer's requestments.

 3.  Marking: as per customer's requests.

 4.  Painting varnish coating on the pipe.

 5.  Plastic caps at ends.

 Delivery Time

 15-30 days or as clients reqestments.

 Supply

 1.  seamless steel pipe

 2.  ERW welded steel pi

 3.  Stainless steel pipe

 4.  carbon steel pipe

 5.  hot-rolled steel pipe

 6.  spiral steel pipe

 7.  galvanized ste

SSAW  PIPE PRODUCTS SHOW 

 


 

Finished Product 

ERW CARBON STEEL PIPE

 

 

SSAW CARBON STEEL PIPE

 

 

 

 

 

 

Production Line

 

 

About packing

 

Our Services

 

 

 

 

 

 

 

 

 

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like