Step 1.Protective tape protects frames from scratches; Step 2.Keep windows &door fixed on iron pallets; Step 3.Tie up windows &door on the iron pallets with plastic belts; Step 4.PE films keep windows &door away from sea water; Step 5.Fill in the space between each two iron pallets by air bags; Step 6.Tie up iron pallets in container with plastic belts. Our packages will ensure the windows arrive at project site in good conditions Note: standard foam packing and wood cases also ok