BS Standard steel structure house prefabricated steel villa

FOB Reference Price:Get Latest Price
$550.00 - $750.00 / Ton | 1.0 Ton/Tons (Min. Order)
Dimensions:
China Standard Steel
Lead Time:
Quantity(Tons) 1 - 1 2 - 10 11 - 15 >15
Est. Time(days) 5 7 10 Negotiable
Customization:
Customized logo (Min. Order: 25 Tons)
Customized packaging (Min. Order: 25 Tons)

More

Graphic customization (Min. Order: 25 Tons) Less
Report Suspicious Activity
Overview
Quick Details
Standard:
AiSi, ASTM, bs, DIN, GB, JIS
Grade:
steel
Place of Origin:
Hebei, China
Brand Name:
hbjs
Model Number:
Q235B Q345B
Type:
Light
Application:
Steel Fabricated House
Tolerance:
±1%
Processing Service:
Bending, Welding, Cutting, Punching
Product name:
BS Standard steel structure house prefabricated steel villa
Material:
Q235/Q345 Low Carbon Steel
Size:
As per drawing
Packing:
wooden or iron pallet
Color:
as requirements
Keyword:
steel structure
Service:
free design
Feature:
Low cost
Surface treatment:
1. Painting 2. galvanized
Application Fields:
Steel Structure Workshop Warehouse Hangar House
Supply Ability
Supply Ability:
5000 Ton/Tons per Month
Packaging & Delivery
Packaging Details
steel strip or up to customers' requirement
Port
tianjin
Picture Example:
package-img
Lead Time :
Quantity(Tons) 1 - 1 2 - 10 11 - 15 >15
Est. Time(days) 5 7 10 To be negotiated

BS Standard steel structure house prefabricated steel villa

Product Specification:

Main Parts

Item Name

Specification

Main Steel Frame

Steel Column

Q235B, Q345B 
H shape, Box, Steel pipe, Hot rolled sheet

Steel Beam

Q235B, Q345B 
H shape, Steel Truss, Hot rolled sheet

Supporting System

Brace

Q235B, Q345B 
Steel rod, Steel pipe, Angle steel

Roof Purlin

C or Z shape, Steel purlin

Wall Purlin

Q235B, Q346B
C or Z shape, Steel purlin

Roof

Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc.,

Wall

Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc.,

Accessories

Bolts

Ordinary, High strength

Gutter

Galvanized Steel plate, Stainless steel

Windows

Aluminum alloy-Glass, Aluminum alloy-shutter, PVC

Doors

Sliding or Rolling door

Downpipes

PVC pipe, Color steel pipe

Edge Cover

Made of color steel sheet thickness 0.5mm

Ventilator

Stainless steel

Crane

Crane in 5 tons to 20 tons


 Products Show:
Company information
 Workshop of steel structure
 Certificate of steel structure:
 Our Advantage of steel structure:     

  If you need we design for you, pls supply us the following parameter



Design Parameters

Size: width X length X eave height, roof slope

1)Live load on roof(KN/M2) Wind speed(KM/H)

2) The function of building, the interior equipmet

3) The special requirement on function

4)Earthquake load if have. Snow load (KG/M2)
5) Demands for doors and windows

6)Crane (if have), Crane span, crane lift height, max lift capacity, max wheel pressure and min wheel pressure!

Packaging & Shipping
 Packing & Shipping of steel structure:   

No

Description

Pictures showed

1

All of the steel column&beam ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment

 

2

To make the loading and unloading more efficiently and saving the delivery cost, 40container is preferred to loading the steel frames

 

3

All the wall & roof panels will be filmed by two sides and fixed stably in the 40 HQ container

 

4

All the windows and doors will be protected by the bubble rapping papers and fixed stably in the container

 

More Products
   
Steel building Steel railing Steel frame

 

Steel Workshop

 

        
 

 FAQ:

  Q: Are you trading company or manufacturer?
  A: We are factory.
  Q: How long is your delivery time?
  A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods
     are not in stock, it is according to quantity.
  Q: Do you provide samples? is it free or extra?
  A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
  Q: What is your terms of payment?
  A: Payment<=1000usd, 100% in advance. Payment>=1000usd,30% TT in advance,
      balance before shippment. if you have another question, pls feel free to contact us.