notice Note: Always contact your supplier to determine if the coronavirus (COVID-19) will affect your order.

China Manufacturer Wholesale Power Supply 1600w 1800w Mining Power Supply 12v for ASIC Miner GPU Miner

$51.00 / Piece | 1 Piece (Min. Order)
Quantity:
- + Pieces available
0piecesselected, US $in total
View Details
Shipping fee:
Depends on the order quantity.
Lead Time:
3 day(s) after payment received
Customization:
Customized logo (Min. Order: 100 Pieces)
Customized packaging (Min. Order: 100 Pieces)

More

Graphic customization (Min. Order: 100 Pieces) Less
Samples: $51.00 /Piece, 1 Piece (Min. Order): Buy Samples
Contact Supplier
Samples - $51.00 /Piece, 1 Piece (Min. Order): Buy Samples
Loading... Add To Cart
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Guangdong, China
Brand Name:
OEM
Model Number:
1600W Power Supply
Output Type:
Single
Output Power:
>500W
Output Voltage:
12V
Output Frequency:
60Hz
Output Current:
133A
Input Voltage:
220V
Warranty:
6 Months
Protection:
OCP OVP SCP OPP
Efficiency:
90+%
Size:
165*150*85mm
Certification:
FCC
Material:
Aluminium case
Connerctor:
multiple
Weight:
275g
Rated Power:
1600W

Packaging & Delivery

Selling Units:
Single item
Single package size: 
17X13X14 cm
Single gross weight:
1.300 kg
Package Type:
1. 1600W Power Supply 2.One set PSU include power cord & accessory bag put in gift box 3.6pcs gift boxes put in 1 export carton. 0.031CBM/CTN 4.Can be shipped by sea,truck, and express company, such as Fedex, DHL,TNT etc.
Lead Time :
Quantity(Pieces) 1 - 100 >100
Est. Time(days) 3 To be negotiated
Product Description

1600w Power Supply 

China Manufacturer Wholesale  Power Supply 1600w 1800w Mining Power Supply 12v for ASIC Miner GPU Miner

Model
1600W Power Supply
Rate Power
1600W
Efficiency
90+%
Connector
Motherboard 24P*1 CPU(4+4)P*1
SATA*8
VIDEOCARD(6+2)P*12
HARD DRIVER(IDE)4P*6
Package
PE bag & 10pcs/brown box 

1.Efficiency exceed 90+%@220V
2.AC input full range design(100 to 240V)
3.Thermal control technology
4.Protection circuitry offer: OVP OPP SCP OCP UVP OTP
5.100% burn-in under ambient temperature upto 45℃
6.100% high voltage test under AC 1.5KV 10mA 3Sec
7.Standby power less than 1W,low power consumption
8.Low ripple,silent
9.MTBF:100K hours at 25℃

Related Products
2400W Power Supply 

1600W Power Supply


1800W Power Supply 

Our Company


FACTORY

With more than 10 years of solid heat dissipation technology.


Good at using finned heat dissipation, air cooled fin heat dissipation, heat pipe riveting fin heat dissipation and water cooling technology.  

Strict Production Process & Quality Standards


Perfect production and testing equipment, quality guarantee system, advanced detection measure and long term technology innovation. 



WE GURANRANTEE ON BEST QUALITY.

* We are all parts of each to undergo a rigorous test of a ship at the same time for each product and by-laws for the internal inspection reports for future reference.

* We offer the defect-free products and satisfying services, we spare no pains to keep improving our quality and we obey accurate delivery at any time.

Packing & Delivery

1.PSU with PE bag packing 


2.One set PSU include power cord & accessory bag put in gift box 


3.6pcs gift boxes put in 1 export carton. 0.031CBM/CTN


4.Can be shipped by sea,truck, and express company, such as Fedex, DHL,TNT etc.

FAQ

Q1. Can I have a sample order for products?
A: Sure, we welcome sample order to test and check quality. Mixed samples also acceptable.

Q2. What about the lead time?
A: Samples needs 1-3 days, mass production time needs 1-2 weeks for order quantity more than

Q3. Do you have any MOQ limit for led light order?
A: 1pc for sample checking is available

Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.

Q5. How to precede an order for products?
A: 1, Let us know your requirements or application.
2, we quote according to your requirements or our suggestions.
3, Customer confirms the samples and places deposit for formal order.
4, Production arranged.


Q6. Is it OK to put my logo on labels?
A: Yes. Please inform us formally before our production and confirm the design firstly based on our sample.

Q7: How to deal with the faulty?
A: Firstly, Our products are produced in strict quality control system and the defective rate will be less than 0.2%.
Secondly, during the guarantee period, we will send new products with new order for small quantity. For defective batch products, we will repair them and resend them to you or we can discuss the solution including re-call according to real situation.