China supplier 500 800l 1000l 2000l 3000l 5000l brewery beer brewing equipment

  • >=1 Sets
    $3,000.00
Model Number:
Tonsen
Lead Time:
Quantity(Sets) 1 - 1 2 - 2 >2
Est. Time(days) 15 20 Negotiable
Report Suspicious Activity
Overview
Quick Details
Processing:
Fermenting Equipment
Condition:
New
Place of Origin:
China
Brand Name:
Tonsen
Processing Types:
Carbonated Beverage
Voltage:
220V, 400V or customized
Power(W):
depend
Dimension(L*W*H):
depend
Weight:
depend
Certification:
CE, ISO
Warranty:
1 Year
After-sales Service Provided:
Field installation, commissioning and training
Material:
SS304, SS316
Heat Type:
Steam, Electricity, Direct Dire
Control system:
PLC
Usage:
Mashing
Thickness of Tanks:
Inner 3mm External 2mm
Keywords:
Brewhouse System
Insulation material:
Rockwool
Cladding:
SUS304, Red Copper
Application:
Brewery
Product Name:
China supplier 5000l brewery beer brewing equipment
Supply Ability
Supply Ability:
10 Set/Sets per Week
Packaging & Delivery
Packaging Details
China supplier 500 800l 1000l 2000l 3000l 5000l brewery beer brewing equipment
Tanks will be packaged with soft protection material and mounted on strong carbon steel frame.
Accessories and spare parts will be packaged with box.
Port
Qingdao Port
Lead Time :
Quantity(Sets) 1 - 1 2 - 2 >2
Est. Time(days) 15 20 To be negotiated

China supplier 500 800l 1000l 2000l 3000l 5000l brewery beer brewing equipment

Product Description

Supplies high quality 304 stainless steel 1 BBL 2 BBL 3 BBL home brewhouse system

Product Application

 

2 vessel: Mash/Lauter Tun, Kettle/Whirlpool Tun

 

3 vessel: Mash Tun, Lauter Tun, Kettle/Whirlpool Tun

 

4 vessel: Mash Tun, Lauter Tun, Kettle Tun, Whirlpool Tun

 

Hot liquor Tank

 

Steam Generator

 

Wort/Hot water Pump

 

Heat Exchanger Plate

 

Work Platform;Fittings;Pipeline

 

     

  

Main Features

The material of the stainless steelThe thickness of stainless steel
It is the Stainless Steel 304.

Some factories are using 201 which is not food grade. And as a customer, it is not easy to test it.

Only when the 201 get rust, you will find it. But it is too late.

Now each batch of our steel plate will be randomly cut one part to be tested in our authoritative lab (government institute) and have the certificate for the material.

Not only the steel plate (sheet), but also the valves, pipes, bolts etc.
Most of the suppliers are quoting with 3mm interior shell and 2mm exterior shell. In fact, the real thickness is only 2.5mm and 1.5mm.

You may find the thinner sheet(plate) will easily distort after welding because of the high temperature.

3mm and 2.5mm, that is about 16% difference in weight. So this part is what customers can not test.

We have the stainless steel quality certificate and also we usually take the samples to test it from the government. We ensure its quality.
Detailed Images

 

Company Information

 

 

1.We are manufacturer. We have strong factory strength, experienced professional and technical personnels andrich export experience. 

2.We do brewery turnkey project.

3.We have large, medium and small brewery equipment, hotel/bars brewing beer equipment, laboratory-teaching equipment, various types of wine equipment, and provide beer equipment accessories, auxiliary equipment, control equipment, supply the main and auxiliary materials of beer brewing.
4.We supply good quality and competitive price. 
5.We supply installation service. 
6.We promise lifetime guarantee.

Certifications

 

Our Services

 
Pre-Sales Service
1) Help the clients to confirm the configuration.

2) Supplying different beer craft specification.

3) Designing the drawing according to the client's floor plan and your requirement.
4) Showing the detailed diagram of the tanks.
 
After-Sales Service
1) We provide turnkey system, on site installation service for brewery projects.
2) It's available for us to send engineers to guide install.
3) Life time guarantee.
4) Online technology consult.

 

 

 

 

Packaging & Shipping
 

All tanks will be packed with soft protection material and mounted on steel frame.

 

After loaded into containers, all equipment will be fixed to the containers.

 All accessories and spare parts will be packed with soft protection material and then put into iron box.   

 

    We can promise to ship the goods in time.I stress this point because at present, the Chinese government has a very strict requirement for the factory, if the factory doesnt have a complete certificates for the production, they will face the problem to be closed. And this will affect the delivery time. And for Tonsen, we have get all the certificates so we never meet this problem. 

 

Contact us

 

 

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like