1.The main steel structure is fixed and packed with steel pallet; 2.packing the pipes into the bundles by the steel strip; 3.packing the small parts by bags and foam; 4.packing sets parts by box. If you don't want to use steel pallets, can choose OPEN TOP CONTAINER.
Port
QINGDAO PORT
Selling Units:
Single item
Single package size:
10X20X5 cm
Single gross weight:
65.000 kg
Supply Ability
Supply Ability
100000 Ton/Tons per Year prefabricated steel structure