notice Note: Always contact your supplier to determine if the coronavirus (COVID-19) will affect your order.

Direct Factory of light Weight Concrete Aluminum Form Work for Home Construction

$50.00 / Square Meter | 250 Square Meters (5 lot) (Min. Order)
1 batch = 50 Square Meters
Type:
Aluminum Formwork
$50.00
- +
available
0piecesselected, US $in total
View Details
Shipping fee:
Depends on the order quantity.
Lead Time:
15 day(s) after payment received
Customization:
Customized logo (Min. Order: 50 Square Meters)
Customized packaging (Min. Order: 50 Square Meters)
Samples: $50.00 /Square Meter, 1 Square Meter (Min. Order): Buy Samples
Contact Supplier
Samples - $50.00 /Square Meter, 1 Square Meter (Min. Order): Buy Samples
Loading... Add To Cart
Report Suspicious Activity
Overview
Quick Details
Brand Name:
CHANGMING
Model Number:
DM-AF-022
Material:
6061-T6,6063-T6
Application:
Concrete construction
Components:
Wall,Column,Stairs,Beam,Slab
Size:
500*2600mm
Certificate:
ISO BV CE SGS
Technique:
Automatic Welding
Bearing capacity:
60KN/sqm
Delivery time:
15-20Days
Color:
Aluminum Color
Weight:
Average 25-28KG/SQM

Packaging & Delivery

Selling Units:
Single item
Single package size: 
10X10X10 cm
Single gross weight:
50.000 kg
Picture Example:
package-img
Lead Time :
Quantity(Square Meters) 1 - 2500 >2500
Est. Time(days) 15 To be negotiated
Video Description

Direct Factory of light Weight Concrete Aluminum Form Work for Home Construction

 

The Construction Aluminum Formwork is a processed with integrated extruded Aluminum profiles and support system,fastening system and accessory system and can be extensively applied in various fields of reinforced concrete construction struction.The entire system is of high standardization,lightweight,strong bearing capacity,high matching accuracy,disassembly convenience,large plate surface,less joints,good stability,long service life,more circulation tiimes,recyclability,good economic benefits and high recovery value.

Aluminum Formwork

 Material

 6061-T6 Aluminium alloy

 Main Components

 Beam,Column,Wall,Prop,Others

 Safe Working Load

 60KN/m2

 Size

 Non-standard: custom-made as per buy’s requirements

 Capacity

 20000 sqm per month

 Applications

 Exhibition setup

 Interior refurbishing

 All the towers can be connected together for multi-purpose

 

The Advantage of Al/uminum Formwork System:

 

1,High-efficiency

  •    High Efficency fast speed installation,25-20m2/Day/Person
  •    Simply and convenient installation,lower the technical requirements for workers and can solve the shortage of Skilled workers
  •    Adopt early remoce system,1sets formwork panel+3sets supporting collection used,which can meet 4days/floor construction schedule;
  •    Compared with Wooden Formwork,one block of 33 floor building,can save about 30 days;

2,Economic

  •    Save about 10% of the Skilled workers,the per average cost is lower;
  •    Save about 50%of the freight,handling fee and 60%of the cost of tower crane;
  •    Save about 60% of the site stack space
  •    After demoulding high flatness and precison,surface rendering can be avoid,save decoration process about 40%of the working hours and more than 85% of the material;
  •    Shorten the Construction waste cleaning time and cost.

 

3,Environmental

  •    Construction environment clean and tidy,can improve workers' working environment and workers' personal safty;
  •    Construction cost less,almost do not product construction waste,no use nails and other consumable material;
  •    Confirm the building beautiful China of green environmental protection idea,the formwork of renewable material,replacing traditional wooden template,reduce deforestation and soil erosion,can brding good social       benefuts.

 

4, Safety Connection

  •     High bearing capacity,50KN/M2,no formwork panel implode and expand;
  •    Stair constructional column,door and window lintel,water edge,lower pond,the camp and other small size a secondary components forming,good effect,can effectively solve the walls,doors and windows,such as          toliet leakage etc.
  •     Can be realized stair inside"civil-doors&windows installation-indoor decorate"Lap water construction at the same time,shorten the construction period.

 

 

 

 

 

 

There is four Major Systems of Aluminum Formwork:

A--Formwork System---To constitute the closed surface desired for concrete structure construction and ensure the forming of constructon structure in concrete pouring.

B--Accessory System---To connect single piece of templates into a whole system,as connection template menber;

C--Support System--To play a supporting role in the process of concrete structure construction and ensure floors,beam bottoms and cantitlevered structures to be held steadily

D--Fastening System--To guarantee the width dimensions of structured formed by templates and ensure no template deformation,expanson or explosion in the profess of conrete pouring.

 

Our workshop shows:

 

 

 

Package:

 

 

 

Any questions on the construction formwork,pls contact with us freely.