Energy Saving Portable Evaporative Air Cooler

  • 300 - 599 Pieces
    $42.00
  • >=600 Pieces
    $40.50
Color:
Lead Time:
Quantity(Pieces) 1 - 300 >300
Est. Time(days) 40 Negotiable
Customization:
Customized logo (Min. Order: 300 Pieces)
Customized packaging (Min. Order: 300 Pieces)

More

Graphic customization (Min. Order: 300 Pieces) Less
Samples:
$44.00 /Piece | 1 Piece (Min. Order) | Buy Samples
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Zhejiang, China
Brand Name:
Kadeer
Model Number:
FLS-Z38A
Capacity (btu):
1000
COP:
/
EER:
/
Power (W):
150
Power Type:
AC
Use:
ROOM
Voltage (V):
220
Condition:
New
Type:
PORTABLE
Certification:
ce, EMC
Cooling/Heating:
Cooling Only
Gross weight:
11.80KG
Net weight:
9.50KG
Timer:
7.5H
Water tank:
30L
Mounting:
Floor Standing
Color:
White
Warranty:
1 Year
Power supply:
220-240V/1Ph/50Hz
Controller:
Remote/Manual switch
Packed size:
495*395*845mm
Power Source:
electrical
Product Certification certification
CB Certified.
CE Certified.
EMC Certified.
GS Certified.
RoHS Certified.
Supply Ability
Supply Ability:
500 Piece/Pieces per Day
Packaging & Delivery
Packaging Details
1pcs in one color/carton box, size 495*395*845mm
Carton Box + Printed Color Paper Insert or According to Customer's Requirements.
Port
Ningbo
Lead Time :
Quantity(Pieces) 1 - 300 >300
Est. Time(days) 40 To be negotiated
Video Description
MAIN PRODUCT
PRODUCT DESCRIPTION

 

MORE PRODUCTS
Company Information

Q1. When can I get the quotation?

A: We usually quote within 24 hours after we get your inquiry.

 

Q2: Can you do the design for us?

A: Yes. but MOQ will be required.

 

Q3: How long can I expect to get the samples?

A: After the payment, the sample will be ready for delivery in 7-10 days.

 

Q4: What about the lead time of mass production?

A: Honestly. It depends on the order quantity and the season you place the order. The lead time of MOQ is about 30 to 40 days.

 

Q5:Do you have inspection procedure before shipping?

A:Yes, we do. 100% QC inspection before shipment.

 

Q6: How about the FOC spare partscan be offered with order? 

A: We offer easily broken parts about 1% of order quantity. Main component like PCB,MOTOR offer 0.5%

 

Q7:Payment Term

A:T/T 30% deposit in advance, 70% against copy of B/L

L/C: An irrevocable L/C at sight

 

Q8:Delivery Time

A:15 days after receipt of payment

35-40 days after order confirmation