Factory supply anti earthquake cheap modern prefab house plan prefabricated houses container chinese home

  • 4 - 7 Sets
    $1,750.00
  • 8 - 11 Sets
    $1,700.00
  • >=12 Sets
    $1,600.00
Material:
Container Sandwich Panel Steel Wooden,Log
Lead Time:
Quantity(Sets) 1 - 20 21 - 50 >50
Est. Time(days) 20 40 Negotiable
Customization:
Customized logo (Min. Order: 1 Sets)
Customized packaging (Min. Order: 1 Sets)

More

Graphic customization (Min. Order: 1 Sets) Less
Samples:
$2,500.00 /Set | 1 Set (Min. Order) | Buy Samples
Report Suspicious Activity
Overview
Quick Details
Warranty:
3 years
After-sale Service:
Online Technical Support, Onsite Installation, Onsite Training, Onsite Inspection
Project Solution Capability:
graphic design, 3D model design, total solution for projects, Cross Categories Consolidation
Application:
Hotel, Carport Hotel House Office Guard House Toilet Warehouse
Place of Origin:
Hebei, China
Brand Name:
Shuang Yi
Model Number:
SY20-2B
Use:
Carport, Hotel, House, Kiosk,Booth, Office, Sentry Box,Guard House, Shop, Toilet, Villa, Warehouse, Workshop,Plant
Product Type:
Container Houses
Design Style:
Modern
Product name:
Structure prefabricated sip house modular container houses
Features:
Light weight/soundproof/fireproof/waterproof
Door:
Security door/Wood door/Aluminum Alloy door
Color:
White,gray or customized colors
Certification:
ISO9001:2008,TUV,CE
Wall and Roof:
EPS/Glass wool/Rock wool/XPS/PU
Additional options:
Ceiling flooring kitchen furniture air conditioner heater etc.
Structure:
Galvanlized Steel Frame
Type:
Light Steel Structure Frame
Supply Ability
Supply Ability:
500 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
1. A standard container house packed in one flat pack, 4 sets combined into one package. It can be shipped on board just as one 20' shipping container, The package will be protected by plywood boards around and thin film wrapped.
2. Mixed packaging. Roof and chassis will be packed together with bolts; all the wall panels packed together with wooden pallet in the bottom, corrugated board on the surface, and XPS board in the interspace. It will be shipped in 40' container.
Or as customers' request.
Port
Tianjin Xingang
Picture Example:
package-img
package-img
Lead Time :
Quantity(Sets) 1 - 20 21 - 50 >50
Est. Time(days) 20 40 To be negotiated
Video Description

This fast installation prefab house can be combined to meet the needs of office or residence.The following pictures are the assembling guidance.

Style1. Splice the parts with small side area together
Style 2.Splice the larger sides of multiple houses together
Style 3.For the 2-story prefabricated house, two houses are spliced at the bottom and two are placed at the top
Packing:
To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.
"Quality is the foundation,and the brand is built with integrity"is our consistent business philosophy. We look forward to the
guidance and cooperation of our customers and business partners.^_^
FAQ
1.Q: Could you please design a new and unique prefab house for me?
A: Absolutely! We are able to provide you with not only construction scheme, but landscape design! One-stop service is our outstanding superiority with no doubt.

2.Q: How Long does it take to build a light steel prefab house?
A: It depends on the size of the house. Generally, one 50 square meter house five workers 1-3days finished installation, save manpower and time


3.Q: Is it difficult to build a prefab house?
A: Totally not, you can build the house independently according to the construction drawings as long as you know how to use an electric tool.


4.Q: How do we cooperate on certain project?
A: Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge.
Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your
confirmation. Finally, we make a deal on alibaba.com with Trade Assurance.
Project details ---> Drawings for your project ---> Revised drawings ---> Transaction confirmation with Trade Assurance


5.Q: What is the delivery time?
A: Delivery time depends on order quantities. Generally, the delivery time will be 15-25 days after receiving the deposit.