Gas generator parts pipe gas parts flame arrester

  • 30 - 99 Pieces
    $159.00
  • 100 - 498 Pieces
    $139.00
  • >=499 Pieces
    $109.00
Output Type:
AC Three Phase
Rated Power:
80KW/100KVA
Shipping:
Support Sea freight
Lead Time:
Quantity(Pieces) 1 - 30 31 - 100 >100
Est. Time(days) 8 15 Negotiable
Customization:
Customized packaging (Min. Order: 100 Pieces)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Hubei, China
Brand Name:
Yonko
Model Number:
DN32
Rated Voltage:
400V/230V
Rated Current:
144A
Speed:
1500/1800rpm
Frequency:
50/60HZ
Product name:
Gas generator parts pipe gas parts flame arrester
Model:
DN32
Engine Type:
6BT Gas Engine
Fuel Type:
Pipe gas
Quality:
Genuine
Sample:
Available
MOQ:
1pc
Size:
Standard/As per customer's request
Material:
304 stainless steel
Packing:
Neutral packing/as per customer's request
Supply Ability
Supply Ability:
3000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
Neutral Packing
Box packing
As per customer's request
Port
Shanghai, Ningbo ,Wuhan or other Chinese port
Lead Time :
Quantity(Pieces) 1 - 30 31 - 100 >100
Est. Time(days) 8 15 To be negotiated

Gas generator parts pipe gas parts flame arrester

Product Description

 

Model No:DN32

Material:304 Stainless Steel

 

   

Related Products
 
Product NameModel No.
ECUYC9010011
Wire HarnessYC9010006
Ignition CoilYC9010009
Spark wire YKTD6
Spark PlugYC9120005
Oxgen SensorYC9010007
Coolant Temperature SensorYC9010002
MAP YC9010003
Speed SensorYC9010004
Electronic throttle valveYC9010005
Pressure Regulator MADAS-03
Filter(low pressure)TG42
MixerYC9120013
Pressure gage 

 

 

Certifications

 

 

Our Company

Hubei Yonko Engine Co., Ltd. is a member of Yunkang Group specializing in power product development and production of high-tech companies.

The company won the title of Chinese national high-tech enterprise.

Yunkang Group is DCEC' excellent agent and partner.

The company develops in-depth applications based on DCEC engines.

The company has a complete engine assembly production line, 460KW engine dynamometer two, 820KW engine dynamometer one, with adequate pipeline natural gas supply.

With an annual production capacity of 10,000 units of diesel or natural gas engines with a maximum capacity of 500 horsepower.

The company has many years of gas and diesel generator set production experience, with complete unit testing equipment.

The company's engine control system division has the development of engine control system and a variety of engine calibration capabilities, to meet different applications of various types of engines.

Main products: Dongfeng DCEC Engines including Gas engines  6BT 5.9/ISDe 6.7 / ISLe 8.9/ISZ 13

Diesel Engines 6BT 5.9/6CT 8.3/6L 8.9/ ISDe 6.7 /ISB 5.9/ ISLe 8.9/ISZ 13

Gas generator set,Engine control system,

And related genuine spare parts.

 
      
 
      
 
      
                                                                                                                                                                                                                                                                              
Our Service

We Hubei Yonko Engine CO.Ltd is a factory of diesel/gas engine ,gas generator set and related genuine spare parts production.

We aspire to provide both our technology and products worldwide to let more and more customers to benefit from our strength and service.

 

**Pre-Sales Service

1)Inquiry and consulting support.   7*24 hours online to reply your inquiry.

2)Sample testing support. Sample order accepted.

3)OEM Manufacturing welcome.

4)View our Factory is warmly welcomed.

5)Can produce by samples or technical drawings. We can build the molds and fixtures.

6)100% test all the goods before delivery

7)keep good quality and competitive price to ensure our customers benefit.

8)We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.

9)EXW, FOB, CFR, CIF, DDU

 

**After-Sales Service

1)Suitable regular sizes and raw materials storage gives us highly efficient delivery time. Customer specifications can be arranged in a timely manner production, delivery can be made within 7-15 days.

2)Training how to install the machine,training how to use the machine.7*24hrs online technical service

3)After receiving the goods,any question feedback can be resolved by our professional Engineer.

 

If you have any other question, please feel free to contact us.

 

 

Contact Us

Mariah(Sales manager)

Mobile+86 15995239998           

(WhatsApp/WeChat are available
Emailsales@yonkoengine.com