Place of Origin
Guangdong, China
Tunnel size
4.5(L) *4.5(H)m(can be customized)
Dimension
16.5(L)* 6.5(W) * 6.5(H)M (can be customized)
Inspection throughput
24trucks/hour
Penetration
more than 300mm steel
Wire Resolution
Dia 1.0mm copper wire
Mix Dose to passengers
<0.2μsv/ scan
Dual energy accelerator
300kv
Operation temperature/Humidity
-15℃- 55℃/ 5℃- 95℃ (non- condensing)
warranty
6 years (on-side service)