Hot sale high efficiency low price entire control system mini hydro power plant for equipment supply

FOB Reference Price:Get Latest Price
$8,500.00 - $52,000.00 / Piece | 1 Piece/Pieces (Min. Order)
Type:
Water power generator
Rated Power:
40kw-200kw
Lead Time:
Quantity(Pieces) 1 - 1 >1
Est. Time(days) 60 Negotiable
Customization:
Customized logo (Min. Order: 1 Pieces)
Customized packaging (Min. Order: 1 Pieces)

More

Graphic customization (Min. Order: 1 Pieces) Less
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Sichuan, China
Brand Name:
Forster
Model Number:
XJ02-W-32/1*8
Rated power:
40kw-200kw
Water Head:
35-120m
Flow Rate:
0.1-0.5m3/s
Frequency:
50Hz/60Hz
Voltage:
220v/380v/400v
Generator type:
brushless excitation
Certificate:
CE/TUV/ISO9001/From-E
Valve:
Butterfly valve / gate valve
Processing method:
CNC machining / constant temperature annealing
Keyword:
mini hydro power plant
Supply Ability
Supply Ability:
40 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
wood box
Port
Shanghai,Shenzhen
Picture Example:
package-img
package-img
Lead Time :
Quantity(Pieces) 1 - 1 >1
Est. Time(days) 60 To be negotiated
Video Description

Hot sale high efficiency low price entire control system mini hydro power plant for equipment supply

         Our main products included:

         (1) Kpaln turbine generators series.

         (2) Turgo turbine generators series,e.g. vertical type horizontal type.

         (3) Tubular turbine generators series ,e.g. Bulb type and shaft extension type.

         (4) Francis turbine generators series.

         (5) Pelton turbine generators series and double turbine generators series and so on.

   

   

 

  Product features :                                   

   1. Horizontal unit has the advantages of simple structure,convenient repair,reduce the plant height,advantages in reducing excavation depth.

   

    2. The vertical unit with plant plane size small,a runner can be provided with a plurality of nozzles,(at most can be installed six nozzles),high specific speed,the same size as units of capacity is relatively small,light weight and so on.

 

 

Product parameters:

 

XJ02-W-32/1 x8  Turgo turbine performance data and supporting table
ModelTurbine ParametersGenerator ParametersDriving modeSpeed WayWater Intake
Design head(m)Under the design  headDesign speed (r/min)The power of generatorThe runaway speedRated speed(r/min)manuallyautomaticModeldianeter
Flow rate (m3/s)The output(kw)
XJ02-W-32/1 x8350.12635.5740407501500Direct connectionmanuallyYTT-3524-H-1.6C0 250
400.13643.2791407501500#####
450.14348.5839407501500#####
500.15157884557501500#####
550.15966927557501500#####
600.166759687510001800#####
650.17293.410087510001800#####
700.17994.4104610010002200#####
750.185104.7108310010002200#####
800.191115.4111810010002200#####
850.197126.3115212510002200#####
900.203137.9118612510002200#####
950.208149.1121816010002200#####
1000.214161.6125016010002200#####
1050.219180.8125016010002200#####
1100.224200.7125020010002200#####
1150.229225.1125020010002200#####
1200.235245.1125020010002200#####

 

Product pictuers:

 

 

 

Other products:

 

 

Company Information

 

Our Workshop:

 

Advantages:

 

Packaging & Shipping

 

FAQ

Q1, Which turbine should I choose?

 Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

 For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

www.fstgenerator.com