JXSS033 sales Aluminum Center Console Arm rest Easy Latch Fix for Mazda B Series

  • 10-99 Pieces
    $2.90
  • 100-999 Pieces
    $2.50
  • >=1000 Pieces
    $2.20
Model Number:
JXSS033
$
- +
available
0piecesselected, US $in total
View Details
Shipping fee:
Depends on the order quantity.
Lead Time:
10 day(s) after payment received
Customization:
Customized logo (Min. Order: 500 Pieces)
Customized packaging (Min. Order: 500 Pieces)

More

Graphic customization (Min. Order: 500 Pieces) Less
Contact Supplier
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Guangdong, China
Brand Name:
JIAX
OE NO.:
JXSS033
Car Fitment:
Mazda
Model:
B Series
Year:
1981-1984, 1982-1984, 1991-1996, 1999-2002, 1993-1994, 1985-1989, 1977-1982, 2002-2006, 1999-2005, 1985-1991, 1985-1996, 1998-1999, 1990-1999, 1987-1990, 1996-1999, 1999-2006
Product name:
Aluminu easy latch fix
Material:
Alumium
Color:
Silver
Weight:
8g
MOQ:
10
Precision:
cnc machining cnc lathe
Quality control:
Full inspection
Samples:
discuss with customer or free cost
Package:
Polybag
Delivery time:
3-7 Days

Packaging & Delivery

Selling Units:
Single item
Single package size: 
1X1X1 cm
Single gross weight:
0.009 kg
Package Type:
Bag and carton
Lead Time :
Quantity(Piece) 1 - 1000 >1000
Est. Time(days) 10 To be negotiated

Steel Oxygen Sensor O2 Lambda Sensor Extender Spacer M18

 

 

1992-2003 Ford Ranger Easy Latch Fix for Center Console Arm rest Mazda B Series

 

Number: JXSS033

Material: Alumminum

Color: Anodized silver

Size: Overall length 1-11/16"

Weight: 9g

Contains: 1 PCS

Packaging: plastic bags in individual packaging

Function: Replaces commonly broken center console latch

Fits 1992-2003 Ford Ranger and 1992-2003 Mazda B-Series

 

Advantages: wide range of sealing, clamping, dustproof and waterproof, easy to install and start

With special tools, perfect precision and repeatable thread

We have a variety of different types of oxygen sensors, welcome to inquire

 



 

  

 

 

 

 

Available Material (metals)Available Material (plastic)
Alloy (aluminum, zinc, magnesium, titanium)ABS, PC,ABS, PMMA (acrylic), Delrin,POM
Brass, bronze, beryllium, copperPA (nylon), PP, PE, T
Carbon steel, stainless steel, SPCCFiberglass reinforced plastics, Teflon
ProcessesSurface treatment (finish)
CNC machining(Milling/Turning), GrindingHigh polish, brush, sand blast, anodization
Sheet metal stamping, bending, welding, assemblyplating (nickel, chrome),powder coat,
Punching, Deep drawing, SpinningLacquer painting, , silk screen, pad printing
EquipmentApplication
CNC machining centers (FANUC, MAKINO)CMM (3D coordinate measuring machine), 
2.5D projector
CNC turning centers/ Lathes / GrindersThread gauge, hardness, caliber.
A closed-loop QC system
Punching, Spinning and Hydraulic tensile machinesThird party inspection available if required
Lead time & PackingApplication
7~15 days for sample, 15~25 days for productionAutomotive industry / Aerospace/ 
Telecom equipment
3~5 days via express: DHL, FedEx, UPS, TNT, etc.Medical / Marine / Construction / Lighting system
Standard export carton with pallet.Industrial Equipment & Components, etc.

 

 

 

 

 

 

 

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like