Kitchen 2 Tanks gas deep fryers price/fryer potato price

FOB Reference Price:Get Latest Price
$140.00 - $160.00 / Sets | 1 Set/Sets (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Condition:
New
Place of Origin:
Hebei, China
Brand Name:
DAINA
Model Number:
DF-84,DF-85
Power Source:
Gas
Voltage:
220V/380V
Power(W):
9kw
Weight:
29KG
Dimension(L*W*H):
590*510*975MM
Certification:
CE ISO
Name:
Deep Fryer
After-sales Service Provided:
Overseas third-party support available
Warranty:
One Year
Supply Ability
Supply Ability:
1000 Set/Sets per Week
Packaging & Delivery
Packaging Details
Wooden Case Packing accord with export standard. After inspection by the quality control department, passing inspection, the machine comprehensive clean-up, and then start packing. First desiccant is placed in the machine And then around the machine with 6 cm thick foam board, winding stretch film for reinforcement, and then add the bubble film. Machine packed in wooden case, and then the metal strip reinforcement. Product packed in containers, depending on the product to be reinforced.
Port
Tianjin,Shanghai,Qingdao or any other ports for deck oven
Lead Time :
15 days

Kitchen 2 Tanks gas deep fryers price/fryer potato price

Product Description

 

 1. Commercial Heavy-duty stainless steel constructed fryer 

2. With stainless steel frying basket and heat-insulated plastic handle
3. Removalble 0.4mm thickness stainless steel food tank for easy cleaning
4. Thermal controller turns back automatically when temperature decreases
5. Temperature control switch adjust from 50-200°C
6. Tank Capacity: 28*2 Liters 
7. Maximum oil capacity: 3-4 Liters when operate
8. "Power"& "Heat" Indicators

Picture for Kitchen 2 Tanks gas deep fryers price/fryer potato price

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

Packaging & Shipping

 

Wooden Case Packing accord with export standard. After inspection by the quality control department, passing inspection, the machine comprehensive clean-up, and then start packing. First desiccant is placed in the machine And then around the machine with 6 cm thick foam board, winding stretch film for reinforcement, and then add the bubble film. Machine packed in wooden case, and then the metal strip reinforcement. Product packed in containers, depending on the product to be reinforced.

 

 

Our Services

 

we are sure to supply overseas installation. Generally, whole production line installation will need about 7 days. And the customer should charge for the visa,the air tickets,the accommodation and the salary.

About our product warranty time:24 months free of charge.

 

 

 

 

Company Information

 

Shijiazhuang Daina Machinery Co.,Ltd specially produce bakery machine for 20 years,we

specialize in supplying a wide range of Bakery equipments.We dedicate to cooperating with bread

manufacturers and provide with various services such as design consultation,equipment

supplying,technician installation and outstanding after sales service.

 

Our main products are baking ovens(rotary ovens,convection ovens,deck ovens,pizza ovens,

tunnel ovens,pizza conveyor ovens),dough spiral mixers,proofer rooms,planetary mixers,dough

dividers and bread moulders,cooling towers and production line which all applied ISO9001 and

CE certificates.  

 

Daina Machinery company has a strong technical team.We keep in step with technologies of

internationally advanced food machinery.We have best quality and best after-sales service. We never only sell machines. We help customers use our machines to

produce best products.

With our fully experienced senior management team,we provide our customers with

professional and satisfying service.

 

 

Daina! Your best choice!

Welcome to visit our website!

  

 

 

 

 

FAQ

 

1. What is the MOQ of the bakery machinery?

   1 set.

2. what is the grantee period?

  The ordinary type is 12 months, and the luxury type is 24 months, and if any components damaged

  in grantee period, we will send same free components by air and will guide for installation.

3. Do you supply overseas installation? How many days you need?And what about the charge?

   Yes, we are sure to supply overseas installation. Generally, whole production line installation will

   need  about 7 days. And the customer should charge for the visa, the air tickets, the 

  accommodation and the salary.

4. What about the packing?

   After finishing the production, we will clean and packed it before it is qualified by the QC manager. 

   First we will put drying desiccant inside the machine (protect the machine from wet damage 

   during the transportation), then put 6mm cystosepiment outside it and upgrade the thermal 

   contracting film.

   Finally we will put wooden case and steel belt. We will upgrade again according to different

   machine to protect the damage of the machine before loading the container.