Modern Steel dome structure

FOB Reference Price:Get Latest Price
$50.00 - $200.00 / Square Meter | 1 Set/Sets (Min. Order)
Shipping:
Support Sea freight
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Shanghai, China
Brand Name:
SUNNYDA
Model Number:
SU-S
Type:
Light
Application:
Steel Fabricated House, Prefab Buildings Etc
Standard:
AISI, ASTM, BS, DIN, GB, JIS
Dimensions:
Requested
Grade:
Q235 Q345B
Name:
prefabricated Warehouse
Keyword:
Luxury Prefabricated Houses
Door:
Roller shutter door
Size:
Customer Required
Color:
Customized Color
Structure:
Galvanized Steel Frame
Certification:
ISO9001
Window:
Alumnium
Usage:
Social Light Steel Villa
Supply Ability
Supply Ability:
800 Ton/Tons per Month
Packaging & Delivery
Packaging Details
Diassembled with export standard container
Port
Shanghai
Lead Time :
Within 30 days afer receiving the deposit of order

Steel dome structure

Product Description

Tugela-structure1c1.jpg 

20134139572694000.jpg

Brand Name:SUNNYDA

Item Name:

Metal building construction projects industrial shed designs prefabricated light steel structure

Material:

Grade Q235, equivalent to ASTM A36.

Grade Q345, equivalent to ASTM A572.

Section:

Any product shape according to customer's requirements

Certification:

ISO quality system, Chinese GB50221-2001

Sand Blast:

Sweden SA 2.5 Sand blasting

Welding Technology:

Single level butt welding, fillet welding by electric arc welding, 

and Gas shielded welding.

Surface treatment:

Hot dip galvanized, Epoxy zinc rich primer

Standard: ISO1461(1999),JIS H 8641-1999,ASTM A 123/A 123M-02

Welding Testing

Ultrasonic Testing, X-ray Testing

Manufacturing Technology

Drilling, Cutting, Assembling, Welding, Rectification, Testing etc

 

Main Components

Base: Cement and steel foundation bolts

Main frame: H beam

Purlin: C or z purlin: Size from C120~C320, Z100~Z20

Bracing: X-type or other type bracing made from angle, round pipe, etc

Bolt: Plain bolt and High-strength bolt

Roof &wall: Sandwich panel or color plate

Door: Sliding or rolling door

Window: Aluminum alloy window 

Sheet: 0.5mm or 0.6mm galvanized sheet

Accessories: Semi-transparent skylight belts,Ventilators, down pipe, Galvanized gutter, etc

   

The reason for choose each metal

Ø Workshop pre-install.

Ø Professional on-site guidance

Ø Ensure the product quality.

Ø Timely service and progress

Ø Production according welding rules a = 0.7 x thickness of web

Ø Continuous welding on both sides of each pieces

Ø Mark every beam on the bottom plate for being saw after being galvanized

Ø Send pictures to the buyer by mail during products being processed

Ø We have 17 years experience of designing and producing steel structure building

Ø Locating in the Shanghai, only need 1 hour by car, the land transport cost cheaper

Ø Our engineers with 20 years steel structure design experience and advanced design software 

    and strict design design attitude

 

Surface Treatment

Hot dip galvanize

Ø Standard: JIS, DIN, ASTM B695-2000

Ø Hot dip galvanizing hole cutting good looking on surface of

Ø Galvanizing process:

     Steel structural components →Degreasing →Rinsing→ Pickling →Rinsing →

     Fluxing → Galvanizing →Quenching → (Passivation) → Inspecting →Finished Product

 

Paint

1.Primer paint one coat 20-30 um

2.Middle paint two coat 40-60 um

3.Finish paint one coat 20-30 um

  Paint type: 1,red primer  2,zinc primer  3,Alkyd primer

Our Project--Metal building construction projects industrial shed designs prefabricated light steel structure

 

Dubai Project , French Project , Qatar Project etc...

11.png
22.png
33.png
 
44.png
 
55.png

 

 

 

 

Prefabricated House

IMG_7566.JPG

 

3333.png

 

 

Packaging & Shipping

 Fixed packing, loading, transportation, unloading the matters needing attention:

(1) the lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) at the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) no rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) the member to the construction site, timely organization of unloading, stacking area.
(6) the crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

 

 2222.png

 

Our Services

1. Enquiry quickly reply within 24 hours.

2.The best and competitive price.
3.Supply good packing way.

 


Why Choose us?
1.High strength and stiffness,high weight bearing
2.Water-proof, Fire-proof,Wind-proof,Earthquake-proof.
3.Sound insulation and heat insulation
4,Easy move Easy maintenance
5.Low cost and nice looking
6.Economy and environment friendly
7.Safty and reliable light steel flexible structure system.
8,Any dimension and customized design is available

 

QQ20160120102856

Company Information

 

Shanghai Sunnyda Industry Co., Ltd. 
Professional manufacturing factory in China.

Honesty is our policy.

Now our main products are Modular house, Villa, container house, steel structure warehouse ,workshop, and EPS sandwich panel, Rock wool sandwich panel,and PU sandwich panel.container cold room,etc...

We have more than ten years experience on many house and panel production, and always put quality as priority.

We take every order you give very seriously! Sunnyda house are customized and we would like to do any changes according to your special requirements.

Sunnyda products have been exported to many countries and regions, for example the Germany, the United Kingdom, Venezuela,
France, Russia, Australia, the UAE, Brazil, Chile, Panama, the , Bolivia, New Zealand, Haiti and Angola. Our company has already passed ISO9001:2000 Certifications.

 111.jpg

Advantage

1.Convenient to assemble and disassemble.
2.Quick installation.
3.Almost dry construction which is environmental friendly.
4.Light and reliable, the steel structure is strong and firm.
5.Nice capacity of water proof, moisture proof and heat insulation and sound insulation.
6.Practical, good space utilization and high price performance.
7.Long life span capacity which could be reach over 30years.

 

Common Q&A

 The Edge

Competitive Prices Our production capacity (approximately 20000 metric tons annually) together with effective and economic
engineering and manufacturing methods enable us to offer the most competitive prices in the industry.
Fast Quotations
Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced software we use.
Fast Delivery
We are able to design, detail, fabricate and supply simple buildings in approximately 1 weeks.
Most of our buildings are delivered and erected within 4 weeks (this relies on various factors such as stock position, weather etc).
Site Supervision
A site supervisor is always present at site to ensure that work is being carried out satisfactorily.
Any problems that arise are quickly dealt with to minimise any delays.
Safety on site is also made a priority. 

 

Contact

 

Tel86-21-57805697
Mobile Phone13916952223 (whatsapp,Viber,Wechat)
Fax86-21-37695697
Address29, Huahui Road, Songjiang District, Shanghai, China
Zip201613

 3232.png