All categories
Featured selections
Trade Assurance
Buyer Central
Help Center
Get the app
Become a supplier

Oil and electricity dual purpose tunnel anchor drilling rig for high-altitude lifting of mining tunnels

No reviews yet
Jining Changsheng Machinery Co., Ltd.Custom manufacturer1 yrCN

Key attributes

Other attributes

Applicable Industries
Manufacturing Plant, Farms, Construction works , Energy & Mining
Showroom Location
None
Place of Origin
Shandong, China
Weight
11200 KG
Warranty
1 Year
Marketing Type
Ordinary Product
Machinery Test Report
Provided
Video outgoing-inspection
Provided
Warranty of core components
1 Year
Core Components
Engine
Key Selling Points
High Productivity
Drilling Diameter
38-90mm
Drilling Depth
0-30m
Condition
New
Use
Ore
Dimension(L*W*H)
9900*2300*2500mm
Way of Pressure
Chain type pressurization
Support Arm
Two sections of multi arm (double support boom)
Sliding Frame Specifications
Stroke length 3m sliding frame
Width of Track
400
Drilling Angle
360°
Electrical Machinery
85KW
Reducer Torque
8000N.m
Drilling Diameter/Depth
38-90mm/10m
Hydraulic Oil Pump
40/40/32
Depth
0-30m

Lead time

Quantity (sets)1 - 1 > 1
Lead time (days)7To be negotiated

Customization

Customized logo
Min. order: 1
Customized packaging
Min. order: 1
Graphic customization
Min. order: 1

Product descriptions from the supplier

1 - 19 sets
$39,800.00
>= 20 sets
$39,200.00

Variations

Total options:

Shipping

Shipping solutions for the selected quantity are currently unavailable

Membership benefits

3-day coupon giveaway: up to US $80 offView more

Protections for this product

Secure payments

Every payment you make on Alibaba.com is secured with strict SSL encryption and PCI DSS data protection protocols

Refund policy & Easy Return

Claim a refund if your order doesn't ship, is missing, or arrives with product issues, plus free local returns for defects