Plastic Pipe Fittings UPVC Expansion Coupling PVC Quick Connector
-
50-99 Pieces$3.55
-
100-999 Pieces$3.20
-
1000-9999 Pieces$2.94
-
>=10000 Pieces$2.40
- Quantity:
- Shipping fee:
- Depends on the order quantity.
- Lead Time:
- 5 day(s) after payment received
- Customization:
-
Customized logo (Min. Order: 50 Pieces)Customized packaging (Min. Order: 50 Pieces)
More
Graphic customization (Min. Order: 50 Pieces) Less
- Place of Origin:
-
Jiangsu, China
- Brand Name:
-
PAIPU
- Model Number:
-
PF004
- Type:
-
Coupling
- Material:
-
Plastic
- Technics:
-
Injection molding
- Connection:
-
Other
- Shape:
-
Equal
- Head Code:
-
Round
- Specification:
-
20mm~160mm
- Pressure:
-
1.0Mpa
- Color:
-
Grey, white or customized
- Standard:
-
GB/T 10002.2-2003
- Raw Material:
-
100% new PVC-U material
- Quality:
-
50 years service time
- Description:
-
Water pipe fittings
- Free sample:
-
Yes
- OEM available:
-
Yes
- Logo:
-
None or customized printing
Packaging & Delivery
- Selling Units:
- Single item
- Single volume:
- 40 cm 3
- Single gross weight:
- 0.08 kg
- Package Type:
- Packed in cartons.
- Picture Example:
-
- Lead Time :
-
Quantity(Piece) 1 - 100 101 - 1000 1001 - 10000 >10000 Est. Time(days) 5 10 20 To be negotiated
Plastic Pipe Fittings UPVC Expansion Coupling PVC Quick Connector
1. Specification:
Expansion Coupling | Spec. (mm) | Spec. (mm) |
20 | 75 | |
25 | 90 | |
32 | 110 | |
40 | 125 | |
50 | 160 | |
63 |
2. Application:
PVC pipe fittings are suitable for a wide range of applications, including:
1) Water supply;
2) Recycled water;
3) Irrigation;
4) Sewerage treatment;
5) Drainage;
6) Rainwater pipelines;
7) Gas;
8) Industrial applications;
9) ... ...
3. Related Products:
4. Advantages:
1) Light weight;
2) Corrosion reistance;
3) Easy installation;
4) Long service life;
5) Low cost;
6) Sanitation;
7) Environment protection;
5. Production Capacity:
Paiputech has first-class injection facilities fully equipped to handle all types of pipe fittings .
· 68 sets of injection machines from 20g to 100,000g;
· 52 sets of accessory machines;
· 10 sets of advanced testing machine.
6. Gating Process:
1) Complete Procurement Management - Customized Service for your China procurement program;
2) Product Development - Professional support and management for the success of the project;
3) Quality Control - Quality assurance of your product manufactured in supplier logistic service;
4) Logistic Service - On time delivery;
5) Research and Reporting Services - Accurate and reliable information to make the right decision.
7. Certificate:
1) ISO 9001 - Our products are of high quality. We ensure our production record is of integrity and traceability.
2) Patent Certificate - We constantly adapt and innovate to ensure our products stay successful in the growing market.
3) National Test Report - Our products are credible and competitive in globle market, meeting the standard of GB/T10002.2-2003.
1) Free sample available ? -- Yes.
2) OEM available? -- Yes.
3) On time delivery? -- Yes.
1) Company Profile:
2) Organization:
3) Turnover:
4) Main Clients:
1) Lead time: within 20 days after deposit received.
2) Payment terms: 30% deposit by T/T and 70% by L/C (others are acceptable).
Thanks for your time!
I will appreciate it if you could send me an inquiry.
You May Like
You May Like
Related Searches :
On-time delivery rate |
- Subtotal
- Depends on the order quantity.