All categories
Featured selections
Trade Assurance
Buyer Central
Help Center
Get the app
Become a supplier

Prefabricated Steel Structure Gymnasium Building, Modular Indoor Sports Facility

No reviews yet

Key attributes

Other attributes

Product Type
Prefabricated steel structure building
Warranty
1 Year
After-sale Service
Online technical support, Installation Consultant
Project Solution Capability
total solution for projects
Application
Indoor sports facilities, athletic centers, school gymnasiums, community recreation centers
Place of Origin
Guangdong, China
Brand Name
PS-Building
Model Number
PSBM10025
Material
Q235B\Q355B, Customizable
Use
Gymnasium
Design Style
Functional, practical, optimized for sports and fitness
Building Structure
Prefabricated steel frame, modular design
Interior Space
Customizable layout to accommodate desired sports activities
Ceiling Height
Ample clearance for various sports and athletic activities
Flooring
Specialized flooring options suitable for sports and athletic use
Lighting and Electrical Systems
Adequate lighting and electrical provisions
HVAC
Heating, ventilation, and air conditioning systems
Amenities
Options for locker rooms, restrooms
Customization
Flexible configurations and optional amenities
Quality Assurance
Strict quality control, durable materials, and construction
Compliance
Meets relevant building codes and safety standards

Lead time

Quantity (tons)1 - 100101 - 10001001 - 5000 > 5000
Lead time (days)304060To be negotiated

Product descriptions from the supplier

1 - 99 tons
$2,000.00
100 - 999 tons
$1,800.00
1000 - 4999 tons
$1,700.00
>= 5000 tons
$1,600.00

Variations

Total options:

Shipping

Shipping solutions for the selected quantity are currently unavailable

Membership benefits

Quick refundsView more

Protections for this product

Secure payments

Every payment you make on Alibaba.com is secured with strict SSL encryption and PCI DSS data protection protocols

Refund policy

Claim a refund if your order doesn't ship, is missing, or arrives with product issues