Stainless Seamless Steel Pipe High Quality Chrome Steel Bearing Steel Pipe

FOB Reference Price:Get Latest Price
$550.00 - $800.00 / Ton | 3 Ton/Tons (Min. Order)
Shipping:
Support Sea freight
Lead Time:
Quantity(Tons) 1 - 10 >10
Est. Time(days) 7 Negotiable
Report Suspicious Activity
Overview
Quick Details
Standard:
GB, API, GB/T 8163-1999, API 5L
Grade:
10#-45#, Q195-Q345, ST35-ST52, API J55-API P110, 10MoWVNb, 10#, 20#, 45#, Q235, Q345, Q195, Q215, ST37, ST52, API J55, 10MoWVNb
Thickness:
1 - 15 mm
Section Shape:
Round
Outer Diameter:
20 - 90 mm
Place of Origin:
Shandong, China
Application:
Oil Gas Sewage Transport
Technique:
Hot Rolled
Certification:
ce
Alloy Or Not:
Non-Alloy
Product name:
Structure Pipe
End protector:
Plastic Pipe Cap
Surface Treatment:
Black painting
Supply Ability
Supply Ability:
1000 Ton/Tons per Month
Packaging & Delivery
Packaging Details
Packaging & Delivery
Packaging Details:
1. Small OD: In hexagonal bundle with steel strips
2. Large OD: In bulk
3. Wrapped in waterproof plastic woven bag
4. Filled in wooden cases
5. As required
Delivery Detail:Shipped in 7-15 days after payment
Port
Qingtao Tianjin
Lead Time :
Quantity(Tons) 1 - 10 >10
Est. Time(days) 7 To be negotiated
Product Description

Stainless Seamless Steel Pipe High Quality Chrome Steel Bearing Steel Pipe

Thickness
1.5~25mm
Surface treatment
Galvanized
Technology
Hot rolling
Application
Automobile machinery
Shape
tubulous
Alloy or not
Non-alloy
Welding type
Seamless welding
Detailed Images
Related Products
Packing & Delivery
Our Service
Certifications
FAQ

Q:Are you a manufacturer?
A: Yes , we are a manufacturer, We have own factory, which is located in LIAOCHENG,CHINA. We have a leading power in producing and exporting steel
pipe,galvanized steel pipe,hollow section,galvanized hollow section etc.
Q:Can we visit your factory ?
A:Warmly welcome once we have your schedule we will pick you up .
Q: Do you have quality control?
A: Yes, we have gained BV, SGS authentication.
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 25-45 days if the goods are not in stock, it is according to quantity.
Q:How can we get the offer?
A:Please offer the specification of the product,such as material,size,shape,etc.So we can give the best offer.