Standard US walk thru frame scaffolding size with stabilisers and braces

FOB Reference Price:Get Latest Price
  • >=1
    US $10.56
Supply Ability:
10000 Piece/Pieces per Week
Port:
Tianjin Port Standard US walk thru frame scaffolding size with stabilisers and braces
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Tianjin, China (Mainland)
Brand Name:
Topway
Model Number:
Scaffolding System
color:
white, bule, green, sliver, orange, dark red..etc
surface finished:
electroplate, hot dip galvanized
size:
1219mm*1700mm
type:
US walk thru frame scaffolding size with stabilisers and braces
main material:
Steel Q195,Q235,Q345
stand pipe:
42.9*2.4mm
Weight:
10.5-17.8kg
Application:
Building Construction,bridge
Certificate::
SGS ISO9001
Component:
catwalk/joint pin/screw jack/cross brace
Packaging & Delivery
Packaging Details
Standard US walk thru frame scaffolding size with stabilisers and braces packing in bulk or bundle.
Delivery Time
20 days after get the deposit

 

Product Description

Standard US walk thru frame scaffolding size with stabilisers and braces

 

Topway movable scaffolding system is set up by 2pcs frame, 2set brace cross, 4pcs joint pin, also can together with scaffolding catwalk, screw jack or wheels. it is construction site for workers to operate and slove the vertial and horizontal tranport and erected a variety of stents. movable scaffodling system has a simple loading and unloading, carrying capacity, the use of safe and reliable features, the development of fast, mobile scaffolding is a variety of new scaffolding, the earliest developed, the most used in construction working. 

 

Frame have two kinds: door frame and ladder frame. currently our frame are painted, it is good for environment, the painted color can use more than 5 years, very cost-effective. for all our masonry frame system can use 3-5 years in common environment. 

 

 

 

 

ProductScaffolding Frame
Place of OriginTianjin China
Brand NameWorld Scaffolding
MaterialQ195, Q235, Q345
Surface TreatmentHot Dip Galvanized, Electroplate, Painted, Powder Coated
TypeH-frame scaffolding,Ladder frame scaffolding,Shoring frame
ColorYellow,blue,silver or customized
CertificateCE,SGS,ISO9001,BV etc.
Application

Working platform,Bridge,tunnel,petrifaction,railway,airport,shipbuilding,

dock industry etc.

Main ComponentsFrame,catwalk,joint pin,cross brace,base jack,u-head jack and caster
Packingin bulk or steel pallet or as customer's request
Delivery TimeAbout 10-20 days after confirmation
ServiceOEM Service is available
Production Capability100 tons per day
Payment TermsL/C, T/T,

 

 

Detail size as below

 

 Frame Scaffolding Walk-through Frame1219*1930mm

Q235

42.7*2.3

42.7*2.0

27*1.5

 Galvanized

 Painting

 Electro-plate

    SGS

 ISO9001

1219*1700mm
1219*1524mm
1219*914mm
 Ladder Frame1219*1930mm
1219*1700mm
1219*1524mm
1219*914mm
 Mason Frame1524*940mm

Q235

42.7*2.3

42.7*2.0

48*3.0

48*2.5

27*1.5

 Galvanized 

 Painting

 Electro-plate

1524*1245mm
1524*1397mm
1524*1549mm
1524*2007mm
 Mini Frame1219*914mm
914*914mm
 Apartment914*3251mm
914*2032mm

 

 

ModelSpc(mm)Surface
Portal 914×1700mmVertical:φ42×2.2mm,Elbow:φ25×1.5mm Hot dip galvanized
Portal1219×1930mmVertical:φ42×2.2mm,Elbow:φ25×1.5mm
Portal1219×1700 mmVertical:φ42×2.2mm,Elbow:φ25×1.5mm
Portal 1219×914mmVertical:φ42×2.0mm,Elbow:φ25×1.5mm
Ladder 914×1700mmVertical:φ42×2.2mm,Elbow:φ25×1.5mm
Ladder 914×914mmVertical:φ42×2.2mm,Elbow:φ25×1.5mm

 

 

Packaging & Shipping

 

Company Information

 

Topway Factory

Xianning City Topway Metal Products Co., Ltd factory is in Tianjin China, more than ten years experience, with advanced production equipment and experienced operator, make sure the quality is guaranteed! also products can accept all kindly test. lead time usully 20-30 days. 

Our Services

 

You can get following on Topway 

1. one-stop purchasing of related scaffolding products from Topway Metal 

2. Related scaffolding including: scaffolding system (ringlock scaffolding system, movable scaffolding system, steel tube and scaffolding clamp, formwork system )

3. Lead time is 20-30 days for all products

4. delivery on time 

5. Reply your inquiry within 24 hours 

6. delivery to you by LCL or FCL, and price items can offer EXW, FOB, CNF, CIF as you wish.

7. Customized the special size for you

 
FAQ

 

1. Why your factory is in Tianjin, but your office is in Xianning City?

Topway Metal is a industry and trade company, as you know for whole scaffolding related products, no one factory can produce all lines, so we can produce the products by our own factory, some other is purchase by our brother factory, all products export from Topway, quality is guaranteed, and with professinal after-sale term.

2. What's your main products?

Topway main products is ringlock scaffolding system, and moveable scaffolding systems. masonry frame, steel props and scaffolding walkboard. aluminum beam all accessories....

3. How about your lead time?

Usually lead time is 20-40 days, some small clamp items can delivery within 3 days. 

Contact information